12 机电工程项目施工技术管理(12 mechanical and electrical engineering project construction technology management).doc
- 1、本文档共20页,可阅读全部内容。
- 2、有哪些信誉好的足球投注网站(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
- 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
12 机电工程项目施工技术管理(12 mechanical and electrical engineering project construction technology management)
12 机电工程项目施工技术管理(12 mechanical and electrical engineering project construction technology management)
2H320000 mechanical and electrical engineering construction management practice
2H320090 mechanical and electrical engineering project construction technology management
2H320091 master mechanical and electrical engineering project construction technical disclosure
First, the content of construction technology disclosure
(1) objects and contents of construction technical disclosure;
1. design requirements: the designers to design the construction unit of the relevant personnel for technical disclosure, the intention of this project, the design requirements and the requirements of the owner of the engineering construction, usually in drawings when.
2. construction organization design disclosure: before the commencement of the project, the construction organization design staff should be to the construction staff for the construction organization design disclosure, in order to do the construction preparation work.
Construction organization design disclosure content: engineering features and difficulties, the main construction technology and construction methods, schedule, organizational structure and division of labor, and quality, safety, technical measures, etc..
3. construction plan disclosure: before the construction of the project, the preparation of the construction plan should be to the construction staff for construction program technical disclosure. In addition, the construction scheme of sub project of technology, new products, new materials, new technology, new technology is the four new project and the special environment, special operations must also to construction workers.
Disclosure content: the construction process and sequence of the project, construction technology, operation methods, main points, quality control, safety measures, etc..
4. design change disclosure
(two) the main contents of construction technical disclosure (2012.6 cases);
Constructi
您可能关注的文档
- (txt版本的)2010-2011学年第一学期形势与政策课免费答案((txt version) free answer for the first semester of the 2010-2011 academic year).doc
- (pmu专稿)援外工程项目施工监理((PMU) construction supervision of foreign aid project).doc
- (广州)检测技术有限公司-岛津_2011830324120051((Guangzhou) Testing Technology Co., Ltd. - SHIMADZU _2011830324120051).doc
- (必读)图片简介((required) picture introduction).doc
- (二)以顾客满意为目标,完善服务质量的管理((two) with customer satisfaction as the goal, improve the quality of service management).doc
- (新版)轮胎翻新技术制造工艺专利大全全文文集((New Edition) tire retreading technology, manufacturing technology patent, Daquan, full text).doc
- (扩词)识字1—课文26((expansion) literacy 1 - text 26).doc
- (二)、人物故事((two) character stories).doc
- (世袭金银财富金银争霸)如何做一名成功的黄金操盘手((hereditary gold and silver wealth, gold and silver contend for hegemony) how to be a successful gold trader).doc
- (精)麦肯锡提案标准流程((standard) McKinsey proposal standard process).doc
文档评论(0)