- 1、本文档共17页,可阅读全部内容。
- 2、有哪些信誉好的足球投注网站(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
- 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
12xcxcxc(12xcxcxc)
12xcxcxc(12xcxcxc)
First, the logging process
The location coordinates well early, retest design team, equipment, materials and materials to design details, check the logging logging conditions - - Discussion - Completion - completion completion data submitted, approval rating, printing and binding file.
1. location: coordinate coordinate unit: oil production factory, hospital etc..
2. site preliminary retest: the survey team completed.
Wells reassays should be completed before the provisions of party in drilling, without bidding or failing to arrange well shall be carried out reconnaissance and initial test wells.
Design: 3. (1), the preparation process: take notice to collect data of adjacent wells design, printing and binding, issuing approval.
(2) design content:
Exploratory well: ① basic data
② regional geology; introduction
③ design basis and drilling purpose
④ designing stratigraphic section and predicting the location of oil, gas and water layers
⑤ formation pore pressure prediction and drilling fluid performance requirements
⑥ access to data requirements
⑦ and sending sample requirements
⑧ well quality requirement and midway test requirement
⑨ technical specifications and requirements
#9321, drawings and schedules (well location drawings, cross well sections, seismograms, section histograms, pressure forecasts, sample analysis, project requirements, etc.)
Development well: ① basic data table
② drilling purpose and design basis
③ design stratified and adjacent well Slicing Data
④ adjacent well data
⑤ requirements for the use of drilling fluids
⑥ access to data requirements
⑦ cementing requirements
#9319, engineering hints and requirements
#9320, drawings and schedules
For 4, wells: (1): comprehensive logging team team, general 6, 7 people, 3 geological team
(2) equipment: exploration well, according to the requirements of Party A
(3) and material: sand box, sample bags, labels, and Drug Analysis Report
(4) data: adjacent well logging map, well logging map an
您可能关注的文档
- (txt版本的)2010-2011学年第一学期形势与政策课免费答案((txt version) free answer for the first semester of the 2010-2011 academic year).doc
- (pmu专稿)援外工程项目施工监理((PMU) construction supervision of foreign aid project).doc
- (广州)检测技术有限公司-岛津_2011830324120051((Guangzhou) Testing Technology Co., Ltd. - SHIMADZU _2011830324120051).doc
- (必读)图片简介((required) picture introduction).doc
- (二)以顾客满意为目标,完善服务质量的管理((two) with customer satisfaction as the goal, improve the quality of service management).doc
- (新版)轮胎翻新技术制造工艺专利大全全文文集((New Edition) tire retreading technology, manufacturing technology patent, Daquan, full text).doc
- (扩词)识字1—课文26((expansion) literacy 1 - text 26).doc
- (二)、人物故事((two) character stories).doc
- (世袭金银财富金银争霸)如何做一名成功的黄金操盘手((hereditary gold and silver wealth, gold and silver contend for hegemony) how to be a successful gold trader).doc
- (精)麦肯锡提案标准流程((standard) McKinsey proposal standard process).doc
文档评论(0)