网站大量收购独家精品文档,联系QQ:2885784924

2011年施工技术员个人工作总结(Personal work summary of construction technician in 2011).doc

2011年施工技术员个人工作总结(Personal work summary of construction technician in 2011).doc

  1. 1、本文档共6页,可阅读全部内容。
  2. 2、有哪些信誉好的足球投注网站(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
  3. 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  4. 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
2011年施工技术员个人工作总结(Personal work summary of construction technician in 2011)

2011年施工技术员个人工作总结(Personal work summary of construction technician in 2011) Technician annual work summary In the work of individuals or departments, the work summary is not only a report to the higher level leaders, but also a reflection on the work of individuals for a period of time. Through a comprehensive and systematic review of a phase of work, it is beneficial for leaders, individuals, or subordinates to understand the completion of the tasks of the units and individuals. Time is always in a hurry, how long is a year? Three hundred and sixty-five sunrises and three hundred and sixty-five sunsets. The teachers annual personal summary is back, and the work and life of this year are full and half. This year I am still in charge of electrical work on the project. The first half of the year is an important structure construction, electrical with civil pipeline embedded and grounding lightning protection work, electrical construction of the project team is the Qinhuangdao local construction company, the quality of construction quality and construction team of Beijing is not a tiny bit, the local quality inspection departments of the requirements are too low, so the first half of my another identity is a professional inspector, strict requirements on their supply is also a learning opportunity for himself, to convince others of course there must be a good reason, professional should have solid professional knowledge. This project has the special, close to the sea, the ground is hard rock, which meet two conditions: first, the corrosion is particularly important in the original design are all used in galvanized steel pipe and welded steel pipe, usually the two tube is the most durable, but in the sea is not practical however, galvanized pipe or welded steel pipe exposed in the air in a half a month above is a thin layer of rust layer, the touch of the hand peeling. Brushed paint has long since gone off. Engineering drawing when I mention this point of supervision to

您可能关注的文档

文档评论(0)

f8r9t5c + 关注
实名认证
内容提供者

该用户很懒,什么也没介绍

版权声明书
用户编号:8000054077000003

1亿VIP精品文档

相关文档