wcdma无线网络规划及部署原则探讨(Discussion on planning and deployment principle of WCDMA wireless network).doc
- 1、本文档共9页,可阅读全部内容。
- 2、有哪些信誉好的足球投注网站(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
- 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
wcdma无线网络规划及部署原则探讨(Discussion on planning and deployment principle of WCDMA wireless network)
wcdma无线网络规划及部署原则探讨(Discussion on planning and deployment principle of WCDMA wireless network)
Discussion on planning and deployment principle of WCDMA wireless network
3G network planning in the early stage largely determines the structure of the network, plays a decisive role in network investment and quality, and is the basis of future network development. 3G development, network quality is the most important, there is no good network quality to do support, and even good business can not be achieved or can not be achieved better. There are a lot of indicators to measure the quality of the network. For 3G, network planning (including wireless and core network planning) is an important means of achieving high quality networks.
This paper focuses on the construction principle and the wireless network planning and WCDMA analysis show the characteristics and advantages of Shanghai Bell Al Carter in the 3G network to help the operators in the construction of high quality.
1. WCDMA - three deployment stage construction principle
A) in initial period
WCDMA technology itself determines the initial network deployment should be based on a reasonable load to the network, the network expansion by increasing the carrier based, supplemented by the principle of the new increase. If CDMA was initially built on a thin layer of network (low load), as the capacity increases, there will be widespread coverage vulnerabilities between base stations. Therefore, the CDMA network due to capacity and increase the demand for the new base station, and can make the network capacity as GSM network as linear growth, especially in the city populated area, distance between the base station itself is very small, this phenomenon will be more serious.
In the initial network deployment, that is to consider investment, use as little as possible base station, but also consider long-term development, as much as possible the potential of network capacity. We propose the adoption of tower to add dense urba
您可能关注的文档
- dos命令应用100(DOS command application 100).doc
- dos操作命令大全1(DOS operation command Daquan 1).doc
- dos技巧100例(DOS skills in 100 cases).doc
- dos语句命令(DOS statement command).doc
- div css兼容问题解决方案(ie55567ff)(DIV CSS compatibility problem solution (ie55567ff)).doc
- div+css兼容问题解决方案(ie55.567ff)(Div+css compatibility problem solution (ie55.567ff)).doc
- dota地图命令(Dota map command).doc
- duoji舵机原理(Principle of Duoji steering gear).doc
- duicefenxi(duicefenxi).doc
- dvd刻录全攻略(DVD burn Raiders).doc
文档评论(0)