网站大量收购独家精品文档,联系QQ:2885784924

城市桥涵工程(Urban bridge and culvert engineering).doc

城市桥涵工程(Urban bridge and culvert engineering).doc

  1. 1、本文档共10页,可阅读全部内容。
  2. 2、有哪些信誉好的足球投注网站(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
  3. 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  4. 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
城市桥涵工程(Urban bridge and culvert engineering)

城市桥涵工程(Urban bridge and culvert engineering) 2K31200 City Bridge Engineering City Bridge Engineering Foundation Pit mainly for pile caps, abutment and expansion of infrastructure construction, generally divided into support and support two. No, a pit (a) without supporting conditions: 1. pit depth of foundation is not deep, the construction period is short, digging pit does not affect the safety of the building near the 2. underground water level is lower than the substrate, or infiltration of small, does not affect the stability of pit wall (two) no pit wall form of foundation pit: pit wall form of foundation pit is divided into vertical wall pit, slope and ladder shaped pit wall and pit wall slope. For the natural humidity near the optimum water content, structure uniform, without sliding, moving, loose or uneven foundation subsidence, foundation pit depth is less than 1~2m may adopt vertical pit wall form. Through the different layers of foundation pit, the pit wall slope according to each layer of soil with different slopes in the pit wall slope transformation at the visual need at least 0.5m wide platform. (three) no foundation pit construction note: 1. excavation should be preceded by good drainage, in the foundation around the top edge to the peripheral drainage slope, and drainage ditches in the appropriate distance, and should prevent water seepage, so as not to affect the stability of pit wall. The excavation, should be timely to drain the water in the pit. 2. pit edge should be a berm, away from the pit is not less than 1.0m; the supporting vertical pit wall pit also should be widened, stacked soil height shall not exceed 1.5m. 3, when construction should observe the pit top floor cracks, the pit wall has no loose collapse phenomenon, ensure the safety of construction. 4, the construction of foundation pit can not continue for too long, since the completion of excavation to the foundation, should seize the time, continuous construction. 5. mechanical exca

您可能关注的文档

文档评论(0)

f8r9t5c + 关注
实名认证
内容提供者

该用户很懒,什么也没介绍

版权声明书
用户编号:8000054077000003

1亿VIP精品文档

相关文档