城市桥涵工程(Urban bridge and culvert engineering)
城市桥涵工程(Urban bridge and culvert engineering)
2K31200 City Bridge Engineering
City Bridge Engineering Foundation Pit mainly for pile caps, abutment and expansion of infrastructure construction, generally divided into support and support two.
No, a pit
(a) without supporting conditions: 1. pit depth of foundation is not deep, the construction period is short, digging pit does not affect the safety of the building near the 2. underground water level is lower than the substrate, or infiltration of small, does not affect the stability of pit wall
(two) no pit wall form of foundation pit: pit wall form of foundation pit is divided into vertical wall pit, slope and ladder shaped pit wall and pit wall slope. For the natural humidity near the optimum water content, structure uniform, without sliding, moving, loose or uneven foundation subsidence, foundation pit depth is less than 1~2m may adopt vertical pit wall form. Through the different layers of foundation pit, the pit wall slope according to each layer of soil with different slopes in the pit wall slope transformation at the visual need at least 0.5m wide platform.
(three) no foundation pit construction note: 1. excavation should be preceded by good drainage, in the foundation around the top edge to the peripheral drainage slope, and drainage ditches in the appropriate distance, and should prevent water seepage, so as not to affect the stability of pit wall. The excavation, should be timely to drain the water in the pit. 2. pit edge should be a berm, away from the pit is not less than 1.0m; the supporting vertical pit wall pit also should be widened, stacked soil height shall not exceed 1.5m. 3, when construction should observe the pit top floor cracks, the pit wall has no loose collapse phenomenon, ensure the safety of construction. 4, the construction of foundation pit can not continue for too long, since the completion of excavation to the foundation, should seize the time, continuous construction. 5. mechanical exca
您可能关注的文档
- 初二语文期末复习测试 (散文)19929(Chinese final review test (Essay) 19929).doc
- 剥色回修技术(Stripping correction technology).doc
- 刺破公司面纱(Piercing the corporate veil).doc
- 办公室主任竞聘演讲稿(Director of the office of competitive speech).doc
- 办公室菜鸟的职场安全守则(Workplace rookie code of workplace safety).doc
- 功能固着心理(Functional fixation psychology).doc
- 动作动画的19个常见缺陷(19 common defects in motion animation).doc
- 动态战略能力及其决定因素(Dynamic strategic capabilities and their determinants).doc
- 动漫名词(Anime NOUN).doc
- 办公室里不宜谈论什么话题 爱问知识人(What's not to be talked about in the office iask).doc
- 2024版建筑工程内部承包与工程监理协议书.docx
- 2024版建筑工程公司资质借用及施工质量保证协议.docx
- 2024版建筑工程公司股权转让撤销及回购权益确认.docx
- 2024版建筑工程人工费承包合同(含农民工权益保障).docx
- 2024版建筑工程公司施工人员技能培训及考核合同.docx
- 2024版建筑工程人工费承包合同(含合同风险防控).docx
- 2024版建筑工程二次结构承包与建筑废弃物处理与回收合同.docx
- 2024版建筑工程二次结构承包与建筑废弃物资源化利用合同.docx
- 2024版建筑工程二次结构承包与建筑废弃物处理与处置合同.docx
- 2024版建筑工程二次结构承包与建筑废弃物处理与回收及处置合同.docx
文档评论(0)