- 1、本文档共57页,可阅读全部内容。
- 2、有哪些信誉好的足球投注网站(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
- 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
挡土墙施工组织设计20160711
常州市金坛区丘荡路西侧、新镇广路东侧河道工程
施
工
组
织
设
计
2016、6、30
目 录
编制说明··············································01
编制依据及原则········································01
2.1编制依据···········································01
2.2编制原则···········································01
三、工程管理目标···········································02
四、工程概况···············································02
4.1工程地理位置及地质情况····························02
4.2工程范围及规模····································03
4.3工程主要特点······································03
五、设备、人员动员周期及材料组织供应·······················04
5.1人员、设备动员周期·································04
5.2技术准备···········································04
5.3材料组织供应·······································05
六、施工准备及临时设施····································05
6.1临时房屋设施·······································05
6.2水、电设施·········································06
施工组织机构的建立····································06
7.1 组织机构设置······································06
7.2施工组织管理机构的运作·····························07
八、施工计划···············································07
工期进度计划······································07
施工设备计划·······································08
各施工队人员构成···································09
材料供应计划及措施·································09
九、施工方法················································10
9.1挡土墙构造··········································10
9.2悬臂式钢筋混凝土挡土墙······························10
9.3重力式钢筋混凝土挡土墙施工··························15
9.4质量标准············································18
9.5质量标准············································19
十、工程质量保证措施·········································20
10.1技术保证措施·······································21
10.2质量管理措施·······································22
10.3施工组织措施·······································27
十一、安全保证措施:··········································28
11.1安全施工主要措施···································28
11.2安全保证体系·······································34
十二、文明施工,加强环保····································38
12.1文明施工······
文档评论(0)