DELAY ANALYSIS FOR CONSTRUCTION (施工延误分析)
DELAY ANALYSIS FOR CONSTRUCTION PROJECTS:
CLASSIFICATION OF EXISTING METHODS
by Alena VASILYEVA-LYULINA **
1. Introduction
Delay is one of the common and typical problems in construction projects. In the study of Assaf and Al-Hejji (2006) 1)
construction delay was defined as “the time overrun either beyond completion date specified in a contract, or beyond
the date that the parties agreed upon for delivery of a project”. In the United Kingdom, a 2001 report by the National
Audit Office, entitled “Modernising Construction,” revealed that 70% of the projects undertaken by government
departments and agencies were delivered late (Lowsley and Linnett 2006)2). Assaf and Al-Hejji (2006) 1) did a survey on
time performance of different types of construction projects in Saudi Arabia ran into the same conclusion (45 out of 76
projects were delayed). A study conducted by the Infrastructure and Project Monitoring Division of the Ministry of
Statistics and Programme Implementation in 2004 in India reported that of 646 central sector projects, costing about
$50 trillion (U.S. dollars), approximately 40% were behind schedule, with delays ranging from 1 to 252 months (Iyer
and Jha 2006)3).
To recover the damage caused by delays, both the delays and the parties responsible for them should be identified.
However, delay situations are complex in nature because multiple delays can occur concurrently and can be caused by
more than one party, or by none of the principal parties (force majeure, etc.). As a result contract schedule and payment
dispute are becoming two most common items of dispute during the construction phase.
2. Types of Delay
Construction project delays can be classified according to their origin into four g
您可能关注的文档
- COMPUTED TOMOGRAPHY IN THE (计算机断层扫描的).pdf
- Computation Fluid Dynamics University of (计算流体动力学大学).pdf
- Computer validation Guide Final draft objectives(电脑验证指南最终稿的目标).pdf
- Computer Simulation and Analysis of High (计算机仿真和分析的高).pdf
- Computer Programming User’s Guide Toro(计算机编程的用户指南托罗).pdf
- concept inventory fluid mechanics Bing My (库存流体力学概念必应我).pdf
- Computer) Programming) inKeyStage3) (计算机编程)inKeyStage3)).pdf
- CONCEPT AND OPERATION MODE OF THE (概念和操作模式).pdf
- ConceptDevelopment 51 Practice Page(ConceptDevelopment 51页练习).pdf
- Concept of Laser Fusion Power Plant Based on (激光核聚变发电厂的基础上的概念).pdf
- 自考《舆论学》考前冲刺必备题及答案 .pdf
- 一年级上册道德与法治-1上2单元《校园生活真快乐》.docx
- 五年级上册语文 第八单元大单元整体教学设计(单元主题解读+单元教学设计+当堂训练+教学反思) .pdf
- 浙江省嘉兴市秀洲区、经开区七校2023-2024学年中考数学考前最后一卷含解析 .pdf
- 初中音乐教学中学生审美能力的培养研究 .pdf
- 儿童呼吸道合胞病毒感染防治 .pdf
- (新统编版)语文二年级上册 第四单元 大单元教学设计 .pdf
- 【二年级】上册道德与法治-第2课 周末巧安排 课件 人教版道德与法治 二年级上册.pptx
- 腾冲市猴桥镇卫生院招聘编制外人员考试真题 .pdf
- 初中道德与法治课外实践活动现状及优化对策 .pdf
文档评论(0)