SUBSTRATE REQUIREMENTS CHEMBOND(衬底需求CHEMBOND).pdf

SUBSTRATE REQUIREMENTS CHEMBOND(衬底需求CHEMBOND).pdf

  1. 1、本文档共4页,可阅读全部内容。
  2. 2、有哪些信誉好的足球投注网站(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
  3. 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  4. 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
SUBSTRATE REQUIREMENTS CHEMBOND(衬底需求CHEMBOND)

SUBSTRATE REQUIREMENTS For Tile to, concrete sealers or curing agents, dirt, wax, tar, paint Properly preparing a substrate is one of the most important and loose toppings. If the surface contains these steps in a tile installation.The best installation is only as good substances, they must be mechanically removed. as the substrate beneath it.Taking the time to properly Note: The use of solvents, adhesive removers or acid prepare a substrate and address job-site conditions should etching is not recommended. be a priority. For best results, see individual Chembond b. Unless sanding or scraping a slab can produce a Product Data Sheets and this document for substrate clean substrate that is free from contamination, more compatibility. aggressive methods such as grinding, shotblasting and scarification should be considered. Environmental Requirements Note: It is important to follow safety guidelines for a. Maintain environmental conditions and protect work the specific substrate, as well as local, provincial during and after the installation. Comply with trade and and federal regulations. industry standards as well as the manufacturers printed c. All supporting surfaces should be structurally sound, recommendations. solid, stable, level, plumb, and true to a tolerance in plane b. When necessary,build a temporary shelter and use of 3 mm in 2,44 m (1/8 in 8 ft.) for walls and 6 mm in indirect a

文档评论(0)

jiupshaieuk12 + 关注
实名认证
内容提供者

该用户很懒,什么也没介绍

版权声明书
用户编号:6212135231000003

1亿VIP精品文档

相关文档