- 1、本文档共11页,可阅读全部内容。
- 2、有哪些信誉好的足球投注网站(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
- 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
Reading4加拿大落矶山脉国家公园内环境冲击极小化之公路改善策略
Strategic Highway Improvements to Minimize Environmental Impacts within the Canadian Rocky Mountain National Parks
加拿大落磯山脈國家公園內環境衝擊極小化之公路改善策略
Highway twinning 公路拓寬
Project description 計畫描述
The need for twinning is based on maintaining an acceptable level of service and highway safety.
The passing lane system on the TCH helped extend the design life of the highway as a two-lane facility by approximately 15 years. However, steadily increasing commercial, private, and tourist traffic has ultimately led to the need to commence twinning the TCH in Banff National Park in phases over the past decade (Parks Canada 1995). The latest 18.6-km stretch between Sunshine and Castle Mountain Interchanges, and known as Phase IIIA, was completed in 1998.
公路拓寬的需求是基於要維持一個可接受的服務水準及公路安全。加拿大橫貫公路(Trans-Canada Highway, TCH)上設計的超車道系統,讓兩線道公路設計的使用年限延長了大約15年。然而,持續增加的商用、私人及觀光的車潮,最終使得班夫國家公園內的TCH道路在過去十年必須分期進行拓寬工程。必威体育精装版的18.6公里是綿延在陽光山(Sunshine Mountain)交流道及城堡山(Castle Mountain)交流道之間─被稱為第3A期工程,於1998年完工。
This section of the TCH prior to twinning comprised two lanes with passing lanes added in the early 1980s using existing shoulders to enhance the level of service as part of the strategy to extend the
design life of the TCH. Accident rates were higher than the average Canadian two-lane highway and double that on the adjacent four-lane divided section. A level of service (LOS) analysis determined that for 2000 h of the year the highway was operating at LOS D and E which affected 1.6 million vehicles or 54% of the yearly volume of 3 million vehicles. Thus, this section of the TCH was operating well below the design LOS C. During summer months, daily volumes between 18 000 and 20 000 vehicles per day were recorded on a regular basis. In addition, this section had a high wildlife collision mortality, affecting the safety of the driving population as well as the animal population (Parks Canada 1995).
TCH這部分的路斷在拓寬工程之前為雙車道,在1980年代初期,利用現存的路肩加設了超車道,以提高服務水準,這是用來延長TCH設計的使用年限之一種策略。其肇事率高於加拿大兩線道公路的平均且是鄰近四線
文档评论(0)