- 1、本文档共6页,可阅读全部内容。
- 2、有哪些信誉好的足球投注网站(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
- 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
VisualInspection外观表面检验-外贸验货员网
Item No. 95212B Customer ACCO Description 18”X24” COMBO BOARD MDF FRAME MDF木框钢板/软木组合板
Revision History
Version# Revision Description Revision Date Prepared by V00 Primary Release Dec-2006 Louis Hou List of attachment:
1. PIP (Product Information Package): 95212B, Initial Release.
2. Generic board spec
Copy to:
Version# Customer Supplier/Vendor Version# Customer Supplier/Vendor
The individual inspection items are checked referencing mainly the customer approved sample as standard.
AQL Level Safety/Critical Functional/Major Minor 0.065 1.0 2.5
Inspection Check Points Sampling Level Classification CR MA MI A Material Identification 材料确认 Each Lot
每批进料 X MDF wood Frame/Tray /Divider, 贴皮木框equivalent.
云杉松木混合,或相当材料.
Finish: 50 gm Paper wrap, Pear wood/ Birch color print. #LD14181-806.
Or refer to Customer approved sample.
表面贴皮纸50克,梨木或桦木色, 色号对照参考板 Hanger : CRS, Pre-plated 挂片: 冷轧镀锌钢板.Thk Ref参考厚度. 0.6mm Steel board: 2mm Thickness, Refer to customer Hard board spec and approved sample
2mm厚,参考客户规格书及确认样板. Cork board: 1/32”+0.005/-0 Thk. Refer to customer PIP cork sheet spec and approved sample
软木板, 0.8mm+0.13/-0厚度. 参考客户PIP 软木板规格书及确认样板. Check for Factory Material Certificate. 检查工厂提供的产品材料证明.
Compare with customer’s material test report. if available对比客方的材料测试报告. X B Check Factory Capability Record 查验工厂生产控制记录
(Auxiliary check辅助性检验) Check the 6 pieces full dimensional analysis per lot from the starting, middle and end of production.
查验工厂生产过程中在开始,中间, 结尾6件产品的全尺寸检验报告 Each Production Session
每一制造周期 X (Remark: QE to verify periodically and QC need to get the record to attach to the ins. Report)
质量工程师需要定期审核, 检验员需查收上述相关记录, 附于验货报告上面 Check the assembly line; it should be have Sample, BOM, Assembly instruction, process control plan, and QC sheet. X 生产流水线需有确认样,BOM清单,装配指导说明书,工序控制计划,以及QC检验报告。 C Vis
文档评论(0)