Intelligent Railway Traffic Management智能铁路运输管理.pptx

Intelligent Railway Traffic Management智能铁路运输管理.pptx

  1. 1、本文档共47页,可阅读全部内容。
  2. 2、有哪些信誉好的足球投注网站(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
  3. 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  4. 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
Intelligent Railway Traffic Management智能铁路运输管理

Intelligent Railway Traffic Management;Content;Traffic management process ;Monitoring system;Traffic control screens DB;Online train graphs Deutsche Bahn ;Train connection supervision DB;Automatic conflict recognition/speed adaptation RCS SBB;Centralized Traffic Control ;Current rescheduling practice;Current traffic management drawbacks ;Essential requirements for railway perturbation management;Real-time traffic state monitoring and prediction;Three-layer process modelling;Train detection;Dutch process mining tool TROTS;Screen shot of TROTS logfile ;Flow chart of process mining algorithm ;;Blocking time;Automatic conflict detection tool (TU Delft) ;Automatic conflict detection tool (TU Delft): Blocking time diagram;(Re-)scheduling decision support models;Shortcomings of microscopic simulation models for real-time rescheduling;Intelligent Rescheduling (1) ;Intelligent Rescheduling (2) ;Intelligent Rescheduling (3) ;Feedforward traffic management information ;Statistical learning methods;Dependence of running time on departure delay IC line 2200;Dependence of dwell time on arrival delay and time of the day in Delft;Current real-time information of train delays ;Running time prediction in case of delays;Monitoring and prediction in the traffic control loop;Based on historical data percentiles of process times are computed: Sum of running times over route segments (outbound route – open track blocks– inbound route) Dwell times Headway times between similar train movements at the point of conflict Connection times between same train series Running and dwell times are updated every 10 – 30 s based on current train positions and current delays Simple model can be extended by clustering historical data and classifying train runs according to: Time of day Rolling-stock type Weather Delay;Change of signal aspects and track occupation/ clearance times explain train movements;Validation of short-term prediction model;Example infrastructure elements of line Rotterdam Centre

文档评论(0)

yaocen + 关注
实名认证
内容提供者

该用户很懒,什么也没介绍

1亿VIP精品文档

相关文档