- 1、本文档共14页,可阅读全部内容。
- 2、有哪些信誉好的足球投注网站(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
- 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
技术要求一般模板(General specification for technical requirements)
技术要求一般模板(General specification for technical requirements)
To sum up, about the basic technical requirements of the following aspects for reference (specific figures, specific terms by the designer according to the actual situation):
1. general technical requirements:
Parts removing oxide skin.
On the surface of the parts, there should be no scratches, scratches and other defects that damage the surface of the parts.
Deburring.
2. heat treatment requirements:
After quenching and tempering, HRC50 ~ 55.
The parts are subjected to high frequency quenching and tempered at 350~370 DEG C, HRC40 to 45.
Carburizing depth 0.3mm.
High temperature aging treatment.
3. tolerance requirements:
The non injection form tolerances shall comply with the requirements of GB1184-80.
Allowance length tolerance allowance + 0.5mm.
The tolerance zone of the casting is symmetrical to the basic dimension of the rough casting.
4. parts edges and corners:
No fillet radius R5.
No injection chamfer is 2 x 45 degrees.
The acute angle is blunt.
5. assembly requirements:
The seals must be soaked before they are assembled.
Rolling bearings are allowed to be heated by oil heating. The temperature of the oil shall not exceed 100 degrees.
After the gearbox is assembled, the no-load test shall be carried out in accordance with the design and process regulations. There shall be no shock or noise during the test, and the temperature rise and leakage shall not exceed the relevant standards.
After the gear assembly, the contact spot and backlash of the tooth face shall comply with the provisions of GB10095 and GB11365.
Sealing packing or sealant shall be allowed for assembly of hydraulic systems, but shall be prevented from entering the system.
The assembly parts and components (including purchased parts, outsourcing parts) must have the certificate of inspection department before they can be assembled.
The parts must be cleaned and cleaned before assembly. There shall be no burrs, edges, skins, rust, chips,
您可能关注的文档
- 扳手腕训练文档(Wrench wrist training document).doc
- 批处理的极限应用(Limit application of batch processing).doc
- 找回好睡眠(Get a good sleep).doc
- 找回还原精灵的密码的七种方法(Seven ways to retrieve the restore wizard's password).doc
- 找回丢失的windows 任务栏图标(Retrieve the missing windows taskbar icon).doc
- 找工作的五险一金你懂么(The job five social insurance and one housing fund you know).doc
- 找广告牌上的错别字大全(Find the billboard typos Daquan).doc
- 批处理bat文件实现各种功能(Batch bat file implements various functions).doc
- 找回删除的文件 __一不小心把文(Recover deleted files __ accidentally put a paper).doc
- 技击之神李书文(Li Shuwen, the God of martial arts).doc
最近下载
- 对标中央八项规定锲而不舍狠抓落实PPT2025中央八项规定精神学习教育课件.pptx VIP
- 全过程人民民主.pptx VIP
- 2020年教学能力大赛现场提问题目及答题要点.docx
- 上浆、挂糊和勾芡.docx VIP
- (高清版)DB34∕T 4574-2023 建设工程文件收集与归档标准.pdf VIP
- 汽车发动机检测与维修教学课件作者秦胜项目六发动机电控系统各传感器检测任务一:空气流量计(G70)的检测课件.doc VIP
- 新课改下高中英语教学的困惑与对策.doc
- 《刘慈欣中英双语科幻经典 青少版1 流浪地球》读书笔记思维导图PPT模板下载.pptx VIP
- 《刘慈欣中英双语科幻经典(青少版)4:山》读后感1000字.docx VIP
- 高中化学必修二方程式总结-.doc
文档评论(0)