网站大量收购闲置独家精品文档,联系QQ:2885784924

投资项目评估学(东财 2014)附答案(Investment project assessment (more than 2014) of the answer).doc

投资项目评估学(东财 2014)附答案(Investment project assessment (more than 2014) of the answer).doc

  1. 1、本文档共33页,可阅读全部内容。
  2. 2、有哪些信誉好的足球投注网站(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
  3. 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  4. 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
投资项目评估学(东财 2014)附答案(Investment project assessment (more than 2014) of the answer)

投资项目评估学(东财 2014)附答案(Investment project assessment (more than 2014) of the answer) First, radio questions (15 questions, 60 points) 1. () refers to a certain scale or a certain size range, the most efficient production enterprises, A. scale range B. economies of scale C. diseconomies of scale D. scale efficiency The correct answer: B Full Score: 4 points: 4 Two Different from the traditional factory pig pig, due to the early weaned piglets by early weaning and artificial insemination in common use, the average annual number of sows farrowing nest reached 2.2 to 2.4 litters, and changed the past season for the annual litter litter, not only improves the yield of the fattening piglets, the annual balance market. This item belongs to ) A. capital intensive B. labor-intensive C. technology intensive D. knowledge intensive The correct answer: C Full Score: 4 points: 4 3. production capacity refers to the enterprise may produce a product in certain production technical conditions and a certain period of time A. average capability B. minimum capability C. maximum capability D. sampling capacity The correct answer: C Full Score: 4 points: 4 4. financial analysis without regard to the sources of funds is () A. financial statement of cash flows B. capital cash flow statement C. financial cash flow statement of each investor D. sources and application of funds The correct answer: A Full Score: 4 points: 4 5. the following is part of the project cash flow table project ____ A. repayment of principal B. construction investment C. income tax D. equity investment The correct answer: B Full Score: 4 points: 4 6. () analysis is a quantitative analysis method that uses the probability research to predict the impact of various uncertainties and risk factors on the evaluation index of investment projects A. sensitivity B. probability C. uncertainty D. breakeven The correct answer: B Full Score: 4 points: 4 7. the assessment of raw material supply conditions must be analyzed and evaluate

您可能关注的文档

文档评论(0)

jgx3536 + 关注
实名认证
内容提供者

该用户很懒,什么也没介绍

版权声明书
用户编号:6111134150000003

1亿VIP精品文档

相关文档