施工现场临时供用电施工组织设计(Construction organization design of temporary power supply for construction site).doc
- 1、本文档共16页,可阅读全部内容。
- 2、有哪些信誉好的足球投注网站(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
- 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
施工现场临时供用电施工组织设计(Construction organization design of temporary power supply for construction site)
施工现场临时供用电施工组织设计(Construction organization design of temporary power supply for construction site)
1. project overview
(1) this project is * * province (city) * project, located in * City, {East}, {Economic Development Zone}, * South Road, * northbound, * Street East, west of * street.
(2) the construction unit of this project is * * * company, the contractor is * company, the design unit is * city building design and Research Institute, the supervision unit is * company, the construction unit is * company.
(3) the floor area of this project * m2, the structural situation is {wholly cast-in-place reinforced concrete frame shear wall}, the total height of buildings * m, common floor. The first floor of this project is designed *, and has a {fire control center}, {reporter} room, two to * layer design office space, * * design *. The ground floor is designed as {room}, and the underground two layer is designed as {garage}, and the mezzanine is designed as {garage}.
2. general situation of power supply and distribution for construction
(1) site design (2) capacity of the platform is {500}kVA, and the ratio is 10 / 0.4kV, the transformer is located at the northeast side of the construction site, and the concrete location is shown in the general plan (not shown in this article).
(2) the low voltage power supply system of this project adopts TN-S grounding system. The low voltage power supply mode is {}}, which is directly drawn from the field transformer substation or the box type substation (first level control), then sent to each distribution box (two and control), and one or two and the distribution system diagram.
(3) a set of {5} fixed distribution boxes are set up on the spot. The specific configuration of the case is shown in Figure 2 (take the distribution box 5 as an example), and the location of the plane is shown in the general plan.
(4) according to the fire protection requirements, a switch is connected in parallel with the low voltage switch at the box type s
您可能关注的文档
- 教师招聘小学语文试题专业基础知识部分(Teacher recruitment elementary language test questions, professional basic knowledge part).doc
- 教师普通话论文之 普通话与小学语文教学(Putonghua in Teachers' Mandarin papers and primary school Chinese Teaching).doc
- 教师招聘体检标准(Physical examination standard for teacher recruitment).doc
- 教师讲课技巧(Teaching skills).doc
- 教师资格考试中学综合素质章节考点归纳(4.4)(Summary of the chapter on comprehensive quality of secondary school teachers' qualification examination (4.4)).doc
- 教师即兴演讲题答题技巧(Teacher's impromptu speech question answering skills).doc
- 教师资格考试幼儿学前卫生学试题及答案(Examination questions and answers for preschool teacher's qualification examination).doc
- 教师面试、试讲制胜招数及注意事项(The teacher interviews, winning tricks and matters needing attention in Teaching).doc
- 教您如何使用吸污车(Show you how to use a dirt truck).doc
- 教战守策(Teach and defend).doc
- 施工现场标语大全(Construction site slogan Daquan).doc
- 施工工艺大全套管成孔灌注桩施工(Construction technology Daquan, casing hole filling pile construction).doc
- 施工现场临时用电安全常识(Temporary safety knowledge of power consumption on construction site).doc
- 新颖的导入设计1(New lead-in design 1).doc
- 施工现场漏电保护器误动作原因及预防措施探讨(Discussion on Misoperation causes and preventive measures of leakage protector in construction site).doc
- 施工现场环境保护与卫生防疫管理制度(Construction site environmental protection and sanitation and epidemic prevention management system).doc
- 施工用电的接零或接地保护(Zero or ground protection of construction electricity).doc
- 新课程实施中的情感, 态度与价值观评价(Evaluation of emotion, attitude and values in the implementation of new curriculum).doc
- 施工问答这里可能有你想要的答案(Construction questions and answers here may have the answers you want).doc
- 施工组织教案(Construction organization lesson plan).doc
最近下载
- 00401比较学前教育复习提纲(2015年版-修改版).doc
- 肠肿瘤和肠息肉-外科学课件.ppt
- 可视化人力资源分析看板.xlsx VIP
- CB01_012 多头小直径防渗墙施工方案.doc
- 人力资源看板.xlsx VIP
- 第10课 保存信息资源 课件 义务教育版2024信息科技三年级全一册.pptx
- 2024年-人教版PEP小学英语六年级下册人教版pep小学六年级英语下册第一单元测试题Unit 1.docx VIP
- 第6课 隋唐时期的中外文化交流(课件)2024-2025学年 历史同步教学课件.pptx VIP
- 糖尿病患者血脂管理中国专家共识2024版.pptx
- 《建筑节能与可再生能源利用通用规范》GB-55015-2021.pdf VIP
文档评论(0)