施工现场临时供用电施工组织设计(Construction organization design of temporary power supply for construction site).docVIP
- 1、本文档共16页,可阅读全部内容。
- 2、有哪些信誉好的足球投注网站(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
- 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
- 5、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
- 6、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们。
- 7、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
- 8、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
施工现场临时供用电施工组织设计(Construction organization design of temporary power supply for construction site)
施工现场临时供用电施工组织设计(Construction organization design of temporary power supply for construction site)
1. project overview
(1) this project is * * province (city) * project, located in * City, {East}, {Economic Development Zone}, * South Road, * northbound, * Street East, west of * street.
(2) the construction unit of this project is * * * company, the contractor is * company, the design unit is * city building design and Research Institute, the supervision unit is * company, the construction unit is * company.
(3) the floor area of this project * m2, the structural situation is {wholly cast-in-place reinforced concrete frame shear wall}, the total height of buildings * m, common floor. The first floor of this project is designed *, and has a {fire control center}, {reporter} room, two to * layer design office space, * * design *. The ground floor is designed as {room}, and the underground two layer is designed as {garage}, and the mezzanine is designed as {garage}.
2. general situation of power supply and distribution for construction
(1) site design (2) capacity of the platform is {500}kVA, and the ratio is 10 / 0.4kV, the transformer is located at the northeast side of the construction site, and the concrete location is shown in the general plan (not shown in this article).
(2) the low voltage power supply system of this project adopts TN-S grounding system. The low voltage power supply mode is {}}, which is directly drawn from the field transformer substation or the box type substation (first level control), then sent to each distribution box (two and control), and one or two and the distribution system diagram.
(3) a set of {5} fixed distribution boxes are set up on the spot. The specific configuration of the case is shown in Figure 2 (take the distribution box 5 as an example), and the location of the plane is shown in the general plan.
(4) according to the fire protection requirements, a switch is connected in parallel with the low voltage switch at the box type s
您可能关注的文档
- 教师招聘小学语文试题专业基础知识部分(Teacher recruitment elementary language test questions, professional basic knowledge part).doc
- 教师普通话论文之 普通话与小学语文教学(Putonghua in Teachers' Mandarin papers and primary school Chinese Teaching).doc
- 教师招聘体检标准(Physical examination standard for teacher recruitment).doc
- 教师讲课技巧(Teaching skills).doc
- 教师资格考试中学综合素质章节考点归纳(4.4)(Summary of the chapter on comprehensive quality of secondary school teachers' qualification examination (4.4)).doc
- 教师即兴演讲题答题技巧(Teacher's impromptu speech question answering skills).doc
- 教师资格考试幼儿学前卫生学试题及答案(Examination questions and answers for preschool teacher's qualification examination).doc
- 教师面试、试讲制胜招数及注意事项(The teacher interviews, winning tricks and matters needing attention in Teaching).doc
- 教您如何使用吸污车(Show you how to use a dirt truck).doc
- 教战守策(Teach and defend).doc
- 2025年公务员考试时事政治模拟试题附完整答案详解(夺冠)考试题库.docx
- 2025年公务员考试时事政治真题(原创题)附答案详解.docx
- 2025年公务员考试时事政治模拟考试试卷(a卷)附答案详解.docx
- 2025年公务员考试时事政治模考模拟试题及参考答案详解【考试直接用】.docx
- 2025年公务员考试时事政治模拟题附参考答案详解(综合卷).docx
- 2025年公务员考试时事政治测试卷含完整答案详解【各地真题】.docx
- 2025年公务员考试时事政治模拟题及完整答案详解(全国通用).docx
- 2025年公务员考试时事政治测试卷附有答案详解带答案详解(综合题).docx
- 2025年公务员考试时事政治模拟题库(夺冠)附答案详解.docx
- 2025年公务员考试时事政治模拟考试题库B卷带答案详解(黄金题型).docx
文档评论(0)