施工现场环境保护与卫生防疫管理制度(Construction site environmental protection and sanitation and epidemic prevention management system).doc
- 1、本文档共5页,可阅读全部内容。
- 2、有哪些信誉好的足球投注网站(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
- 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
施工现场环境保护与卫生防疫管理制度(Construction site environmental protection and sanitation and epidemic prevention management system)
施工现场环境保护与卫生防疫管理制度(Construction site environmental protection and sanitation and epidemic prevention management system)
Construction site environmental protection and sanitation and epidemic prevention management system
I. Basic requirements for environmental protection
(1) basic provisions
1., the construction organization design of the project should be effective measures to prevent dust, noise, solid waste and wastewater pollution environment, and seriously organize the implementation of the construction work.
2, the construction site should establish environmental protection management system, responsibility to be implemented, and ensure effective operation.
3. inspection of dust control, noise, water pollution and environmental protection management at the construction site.
4. conduct regular training and assessment of environmental regulations and knowledge for workers and staff members.
(two) basic requirements for the prevention and control of air pollution
1. the main road on the construction site must be hardened. The construction site shall take effective measures such as covering, curing, greening, watering and so on, so as not to be muddy or dust free. The material storage area, large template storage area and other sites on the construction site must be leveled and compacted.
2., in case of four winds, the weather may not be earth backfill, transshipment, and other may cause dust pollution construction.
3., the construction site should be specially responsible for environmental protection work, equipped with appropriate sprinkler equipment, timely watering, dust pollution reduction.
Construction waste 4. buildings must be closed by the special garbage removal or closed container lifting, prohibit volley thrown. Construction site should be closed garbage stations, construction waste, living garbage classified storage. Construction garbage should be ahead of the amount of water, and according to the provisions of timely removal and disposal.
5. cement an
您可能关注的文档
- 教师面试、试讲制胜招数及注意事项(The teacher interviews, winning tricks and matters needing attention in Teaching).doc
- 教您如何使用吸污车(Show you how to use a dirt truck).doc
- 教战守策(Teach and defend).doc
- 教材疑点三问(Three questions for teaching materials).doc
- 教材的运用(Application of teaching materials).doc
- 教科版三年级上册科学概念和知识要点复习提纲(English edition version of the third grade on scientific concepts and knowledge points review outline).doc
- 教您如何挑选酱油(Teach you how to choose soy sauce).doc
- 教考分离试卷10答案_().doc
- 教师节必看电影(Teachers' day must see movies).doc
- 教育上的十种著名效应(Ten famous educational effects).doc
- 施工用电的接零或接地保护(Zero or ground protection of construction electricity).doc
- 新课程实施中的情感, 态度与价值观评价(Evaluation of emotion, attitude and values in the implementation of new curriculum).doc
- 施工问答这里可能有你想要的答案(Construction questions and answers here may have the answers you want).doc
- 施工组织教案(Construction organization lesson plan).doc
- 施瓦辛格健身健美计划(Schwarzenegger fitness program).doc
- 施救溺水患者方法(Rescue drowning patients).doc
- 施肥注意事项(Notes for fertilization).doc
- 施虐-受虐的心理动力学与适应意义.doc
- 施工方案封面(Construction plan cover).doc
- 旅游业与区域经济融合发展研究(Research on the integration of tourism and regional economy).doc
文档评论(0)