网站大量收购独家精品文档,联系QQ:2885784924

施工员题(Builders question).doc

  1. 1、本文档共5页,可阅读全部内容。
  2. 2、有哪些信誉好的足球投注网站(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
  3. 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  4. 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
施工员题(Builders question)

施工员题(Builders question) Builders examination questions First, the multiple-choice question 1, concrete construction joints continue to be pouring concrete should be handled as follows (ABCD). A, construction joints should be chiseled, clean B, 10-15mm cement mortar shop first C, remove the mortar on the reinforcing steel bar, D, and strengthen the vibration at the construction joint 2, concrete column construction joints can stay (ABD) parts. A, base top B, beam bottom C, plate bottom 2 - 3cm D, plate top surface 3, below belong to the influence of rebar and concrete adhesion force size factor is (ABCD). A, water cement ratio B, steel reinforcement diameter C, protective layer factor D, steel anchorage length 4, the following on the concrete construction joints to leave the location, the correct is (ABD). A, beams higher than 1m shall not be poured with the slab at the same time The B and one-way plates can be left in any position parallel to the short edge C, concrete wall construction joints shall not remain at the junction of vertical and horizontal wall Construction of D and concrete plate seams should be construction and ladder joints corresponding to 5, the main factors affecting the strength of concrete are (ABCD). A, water cement ratio, B, curing condition C, cement mark D, construction method 6, the construction requirements of the formwork system are (AC). A, ensure the shape, size and position of the structural components are accurate, B, the template surface is smooth and smooth C, has enough strength, stiffness and stability of D, and the joint close without leakage 7, concrete and workability include (ABD) and so on. A, fluidity, B, cohesiveness, C, slump, D and water retention 8, the masonry wall left straight Cha approach is correct (ABC). A, must be in the vertical intervals of 500 mm diameter 6 B, configuration of steel tie bar ends shall be bent 90 degrees hook C, Rachel tendons shall be extended to connect a 500 mm D, each pull rib material is 10

您可能关注的文档

文档评论(0)

jgx3536 + 关注
实名认证
内容提供者

该用户很懒,什么也没介绍

版权声明书
用户编号:6111134150000003

1亿VIP精品文档

相关文档