网站大量收购独家精品文档,联系QQ:2885784924

替代料的用法(Use of substitute materials).doc

替代料的用法(Use of substitute materials).doc

  1. 1、本文档共5页,可阅读全部内容。
  2. 2、有哪些信誉好的足球投注网站(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
  3. 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  4. 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
替代料的用法(Use of substitute materials)

替代料的用法(Use of substitute materials) As far as I know, many software is built for each supplier with a material that is instead of a material The advantage is that when certain OEM specifies the data of a vendor, subsequent MRP operations and purchases are better handled This is the two question, BOM how to build on how to build ah, according to the actual production drawings or the corresponding structure to build it. The same material mentioned by the landlord has a lot of suppliers. This situation is very common. This information is not reflected in the BOM structure, but in the process The approval of the procurement module, the list of suppliers (PSL) and the source supplementary rules reflect that the PSL represents the same material for each individual The suppliers situation, the source supplementary rule, is the problem of resolving the proportion of each suppliers allocation. To explore the use of substitute materials The term substitution is basically used by all enterprises. Handling the quality and procurement anomalies, purchasing adjustments, and ensuring the normal operation of the production, substitutes undertake this responsibility. There are many reasons for substitution, and there are many uses, but basically it can be summed up in the following ways: 1. the MRP controller (i.e. the material planning department) determines which material to use in production. Basically, such a situation occurs when two essentially identical (not identical) materials can be substituted for each other, which may be the distinction between different suppliers or different regions of the same material. 2., when a material is not used enough, use another material instead. This is generally a matter of expediency, and there is often an alternative substitute material between the price, quality or performance difference. 3. discontinuous material replacement, that is, the purchase decision, will be used after the completion of a certain material, will no longer use this

您可能关注的文档

文档评论(0)

jgx3536 + 关注
实名认证
内容提供者

该用户很懒,什么也没介绍

版权声明书
用户编号:6111134150000003

1亿VIP精品文档

相关文档