- 1、本文档共44页,可阅读全部内容。
- 2、有哪些信誉好的足球投注网站(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
- 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
HPHTTestingGuidelines-斯伦贝谢
I N D E X
1. Introduction
2. Design Specification
2.1 Proposed Equipment Layout
- Layout Drawing
2.2 Process and Instrumentation Details
- PID Drawing
- Process Line Data Sheet
- Instrument Data Sheet
- Equipment Data Sheet
2.3 Equipment Pressure Temperature Rating
- Equipment Pressure Temperature rating
2.4 Safety Systems - Details
- SAFE Chart
- Safety System Philosophy
- Safety Analysis Tables
2.5 System Throughput Calculations
- System Throughput Recap
- System Throughput Details calculations
2.6 PSV’s Pressure Drop Calculations
- PSV Sizing Recap
- PSV Pressure Drop Details calculations
2.7 Landing String Design
- Subsea Equipment Drawing
- Subsea X-Over listing
3. Technical Specification
Surface equipment data sheets
Subsea equipment data sheets
4. Recommended Operating Procedures
4.1 Equipment Preparation
4.2 Rig Up of Surface Equipment
4.2.1 Pipework Procedures
4.2.1.1 WECO Type Pipework (Lipseal type)
4.2.1.2 WECO Type Pipework (O-Ring type)
4.2.1.3 Flange Type Pipework (Raised face type)
4.2.1.4 Flange Type Pipework (Ring Groove type)
4.2.1.5 Techlok Clamp Type Pipework
4.2.2 Pressure Testing Procedures
4.3 Guidelines for Equipment Operations
4.3.1 Explosive Decompression.
4.3.2 EZ Valve Operations
4.3.3 Choke Manifold Operations
4.3.3.1 Well start up through choke manifold
4.3.3.2 Changing from adjustable choke to fixed choke
4.3.4 Heat Exchanger Operations
4.3.4.1 Well start up
4.3.4.2 Passing the flow through the Heat exchanger coil
4.3.4.3 Directing of steam supply to vessel
4.3.5 Separator Operations
4.3.5.1 Well start up through separator bypass
4.3.5.2 Directing of well through separator
4.3.5.3 Bypassing of well from separator
4.3.6 Burner Operations
4.3.6.1 Start up procedures for operation of burners
4.3.6.2 Procedures for changing over booms
4.3.6.3 Burner shutdown.
4.3.7 Oil Manifold Operations
5. DST Downhole Test Tools
Proposed DST String
DST Equipment Technical data sheets
6. TCP Tubing Conveyed Perforating
Propos
您可能关注的文档
- 2上海市新型建设工程材料(新型墙体材料)认定申请表.doc
- 2、货币政策目标 .ppt
- 2北京财智财富资产管理中心(有限合伙)合伙份额确认书.doc
- 2吨燃煤锅炉与天燃气锅炉费用对照表.doc
- 2伺服控制器的初始化设置.ppt
- 27河中石兽课件.ppt
- 2广东省交通建设工程现场检测和工程材料试(检)验收费标准表(新增51.doc
- 2徐邦桃-加强学科教研组建设积极实施有效校本教研【青岛2011810】.ppt
- 2抛物线(二次函数)中的直角三角形.doc
- 2晶闸管的结构和工作原理.ppt
- 《GB/T 32151.42-2024温室气体排放核算与报告要求 第42部分:铜冶炼企业》.pdf
- GB/T 32151.42-2024温室气体排放核算与报告要求 第42部分:铜冶炼企业.pdf
- GB/T 38048.6-2024表面清洁器具 第6部分:家用和类似用途湿式硬地面清洁器具 性能测试方法.pdf
- 中国国家标准 GB/T 38048.6-2024表面清洁器具 第6部分:家用和类似用途湿式硬地面清洁器具 性能测试方法.pdf
- 《GB/T 38048.6-2024表面清洁器具 第6部分:家用和类似用途湿式硬地面清洁器具 性能测试方法》.pdf
- 《GB/T 18238.2-2024网络安全技术 杂凑函数 第2部分:采用分组密码的杂凑函数》.pdf
- GB/T 18238.2-2024网络安全技术 杂凑函数 第2部分:采用分组密码的杂凑函数.pdf
- 《GB/T 17215.686-2024电测量数据交换 DLMS/COSEM组件 第86部分:社区网络高速PLCISO/IEC 12139-1配置》.pdf
- GB/T 13542.4-2024电气绝缘用薄膜 第4部分:聚酯薄膜.pdf
- 《GB/T 13542.4-2024电气绝缘用薄膜 第4部分:聚酯薄膜》.pdf
文档评论(0)