网站大量收购闲置独家精品文档,联系QQ:2885784924

分支水平井裸眼分段压裂完井技术.ppt

  1. 1、本文档共27页,可阅读全部内容。
  2. 2、有哪些信誉好的足球投注网站(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
  3. 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  4. 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
分支水平井裸眼分段压裂完井技术

Completely different approaches are required for each ML level. This categorization illustrates the degree to which multilateral technology is completion driven. While the Level 1 and Level 5 wells may have similar drilling requirements, the completion requirements for the two may have very little in common. The definition of each level is as follows. Level 1 - Open unsupported junction. The mainbore trunk and lateral trunk are barefoot or have a slotted liner hung off in either bore. Level 2 - Mainbore trunk is cased and cemented with the lateral either barefoot or with slotted liner dropped off in open hole. Level 3 - Mainbore trunk is cased and cemented with the lateral cased but NOT cemented at the junction. Level 4 - Mainbore trunk and lateral are both cased and cemented. Both bores are cemented at the junction. Level 5 - Pressure integrity junction. Straddle packers or integral mechanical casing seal. Cement alone is NOT an acceptable means of obtaining long term hydraulic integrity. Level 6 - Pressure integrity junction achieved with casing. (Again, Cement alone is NOT acceptable) Level 6S - Downhole Splitter with large main bore and 2 (smaller) lateral bores. Completely different approaches are required for each ML level. This categorization illustrates the degree to which multilateral technology is completion driven. While the Level 1 and Level 5 wells may have similar drilling requirements, the completion requirements for the two may have very little in common. The definition of each level is as follows. Level 1 - Open unsupported junction. The mainbore trunk and lateral trunk are barefoot or have a slotted liner hung off in either bore. Level 2 - Mainbore trunk is cased and cemented with the lateral either barefoot or with slotted liner dropped off in open hole. Level 3 - Mainbore trunk is cased and cemented with the lateral cased but NOT cemented at the junction. Level 4 - Mainbore trunk and lateral are both cased and cemented. Both bor

文档评论(0)

wyjy + 关注
实名认证
内容提供者

该用户很懒,什么也没介绍

1亿VIP精品文档

相关文档