不错的监理周报范本.doc

  1. 1、本文档共4页,可阅读全部内容。
  2. 2、有哪些信誉好的足球投注网站(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
  3. 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  4. 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
不错的监理周报范本

监理周报 Jianli Weekly Report 工程名称:焊接器材(威海)有限公司厂房工程 日期(Date:):2007.08、07 Project name : EV project  编号(Serial Number):06 本周概况 General Situation of This Week 1, beam and slab formwork installation of office building level 3 was done. Steel bar fabrication and installation of beam was done as well. 1:办公楼三层楼面梁、板模板支设,梁钢筋制作、安装; 2, east side retaining wall construction was in progress. 2:东面挡土墙毛石墙施工; 3, backfill of warehouse foundation was done. 3:厂房基础内回填土方; 4, wall and slab concrete pouring was done of water tank. 4:消防水池墙板混凝土施工 5, wall and slab steel bar installation and formwork installation of water tank were done. 5:消防游水池墙板钢筋安装、模板安装; 本周进度 情况 Progress of This Week 1,column steel bar installation of office building level 3 was in progress. And formwork installation was in progress. 1:办公楼进入三层柱钢筋安装阶段。模板支架搭设阶段’; 2, short column of warehouse foundation was almost done. Foundation bolts installation was almost done. 2:厂房基础短基本结束,钢构地脚螺栓安装基本结束; 3, east side retaining wall construction was in progress. 3:东侧挡土墙正在施工中, 4, wall and slab concrete pouring of water tank was done. 4:消防水池墙板混凝土结束; 5, backfill of warehouse foundation was done. 5:主厂房基础已回填土方; 施工质量情况 Construction Quality Situation 1, mortar of retaining did not meet requirement and WJ was asked to redo.  1:挡土墙施工质量砂浆灌缝不够密实,;已要求总包加强管理, 对不合格的地方要作返工处理; 2, big area backfill was done by big equipment and corner should be paid more attention. 2::回填土大面积为机械回填,对角落及难点处人工回填,并采用打夯机夯实, 3, steel binding did not meet requirement and WJ has redone. ; 3;水池钢筋绑扎、钢筋之间的间距不符合规范要求,总包已整改,符合要求; 4, concrete pouring of water tank met requirement. 4:水池混凝土施工符合要求 5, concrete after check was commercial concrete and intensity level was C30 which complied with design requirement. 5:混凝土检查为商品混凝土,强度等级:C30,与设计要求一致; 6, concrete curing was done after 24 hours of pouring. 6:浇灌后24小时进行了浇水保养; 7, steel type, size, grade and quantity met design requirement. 7:钢筋安装的品种、规格、级别、数量符

您可能关注的文档

文档评论(0)

pangzilva + 关注
实名认证
内容提供者

该用户很懒,什么也没介绍

1亿VIP精品文档

相关文档