Cameron SSMC 整体式井口装置安装操作手册
SSMC System
Installation Procedure
The SSMC equipment described and depicted in this installation procedure is for reference purposes only. The equipment purchased may vary from this procedure and should be handled accordingly.
Surface Wellhead Publication RP-775
January 31, 2003
? Copyright Cooper Cameron Corporation, 2003
Table of Contents
System Drawing 5
Bill Of Materials 6
Stage 1 — 30 Conductor 8
Install the Landing Ring 8
Install the Housing 9
Install the Drilling Adapter 11
Stage 2 — 13-3/8 Casing 12
Test the BOP Stack 12
Running the Wear Bushing before drilling 13
Retrieving the Wear Bushing after drilling 14
Install the Compact Spool 15
Test between the Seals 18
Install the Transition Seal 19
Install the Drilling Adapter 21
Stage 3 — 9-5/8 Casing 22
Test the BOP Stack 22
Blind Ram Test 23
Run the Wear Bushing before Drilling 24
Retrieve the Wear Bushing after Drilling 25
Hang off the 9-5/8 Casing 26
Washout the Compact Spool 29
Install the Seal Assembly 30
Testing the Seal Assembly 33
Stage 4 — 2-7/8 Tubing 34
Test the BOP Stack 34
Run the Wear Bushing before Drilling 35
Retrieve the Wear Bushing after drilling 36
Washout the Compact Spool 37
Install the Tubing Hanger 38
Install the control lines 38
Testing the Tubing Hanger Annular Seals 43
Install the SRL Seal 45
Install the Christmas Tree 46
Test the Hub Connection 48
Test the SRL Seal 48
Table of Contents (cont)
Emergency 20 Procedure 49
Install the Emergency Sliplock Adapter 49
Energize the P Seals 51
Test the Seals 52
Emergency 13-3/8 Procedure 53
Install the Compact Spool 53
Install the Emergency Sliplock Adapter 55
Install the Transition Seal 58
Emergency 9-5/8 Procedure 59
Run the 9-5/8 Emergency Casing Hanger 59
Washout the Compact Spool 61
Install the Seal Assembly 62
Testing the Seal Assembly 65
Torque Chart 66
Torque Chart 67
Conductor
20 Casing
13-3/8 Casing
9-5/8 Casing
Control line RP020695
2-7/8 Tubing
Bill Of Materials
您可能关注的文档
- ABC库存管理法精讲.ppt
- ACS治疗与出血风险.ppt
- ACEI与冠心病指南.ppt
- alcatel OXE指令详细.doc
- AgilePoint 商業流程建置基礎實務.ppt
- ALOKA彩超探头和配件单.doc
- '金融理论与实务'课堂笔记.doc
- ANSYS功能简介及操作界面介绍.doc
- AOLB製程、PCB材料特性簡介.ppt
- AOC形象店手册.ppt
- 浙江省临海市白云高级中学2025届高三历史3月月考试题.doc
- 云南拾谷县第一中学2024_2025学年高二物理上学期10月月考试题.doc
- 2025版高考生物总复习第13讲基因的分离定律教案苏教版.doc
- 湖北省黄石实验高中2024_2025学年高一历史下学期期末考试模拟卷.doc
- 通史版2025版高考历史大一轮复习专题七近代化的曲折发展__中日甲午战争至五四运动前4第4讲从维新思想到新文化运动课后达标检测含解析新人教版.doc
- 2024年高考数学考试大纲解读专题04导数及其应用含解析文.doc
- 河南省许汝平九校联盟2024_2025学年高一语文上学期期末考试试题扫描版无答案.doc
- 江西省吉安市吉水县第二中学2024_2025学年高一历史上学期第二次月考试题.doc
- 北京市平谷区2025届高三政治一模考试试题含解析.doc
- 2025届中考物理第四讲物态变化专项复习测试无答案新人教版.docx
文档评论(0)