- 1、本文档共10页,可阅读全部内容。
- 2、有哪些信誉好的足球投注网站(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
- 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
电气毕业设计外文文献翻译
附录:
外文资料与中文翻译
外文资料:
Selection and Cooling of Power Transformer
The selection of the transformer can have a major impact on the cost of a substation,since the transformer represents the major cost item.Nameplate rating is only a guide to transformer application, and should only be used as a first step in the selection process.The transformer is available as a self-cooled unit, or it can be purchased with additional steps of forced cooling that use fan or fans and oil pumps.The nameplate ratings can be increased from 25%to 66% by the addition of fans pumps. The nameplate rating is based on a continuous load producing a 55 0C to 65 0C conductor temperature rise over ambient. Since many transformers do not carry continuous loads,advantage can be gained from the thermal time lag to carry higher peak loads without exceeding the temperature limits. Transformer ratings are based on the assumption that only an extremely slow deterioration of insulation will take place with normal operation. A substantial increase in rating can be achieved by accelerating the loss of insulation life, This increase in rating might approach 200%for an hour or two, and approximately 120% for 24 hours. For substations that are designed to carry full load under the outage of any one transformer, a high emergency rating for a 24-hour period (e.g. Until the failed unit can be replaced) could mean the selection of smaller transformer and a substantial saving in substation cost.
The selection of the transformer should involve a careful evaluation of a number of other factors:
Impedances should be selected considering their effect on short-circuit duties and low-side breaker ratings both for initial and future station developments. In addition, impedance is important to achieve a division in the parallel operation of transformer.
No load tap ranges should be selected to provide an adequate low-side bus voltage.
If the high-side or low-side voltages vary over a wide range during the load cycle, it ma
您可能关注的文档
最近下载
- 【课件】神来之笔(幻想与偶然)课件高中美术人教版(2019)选择性必修1绘画.pptx VIP
- 2025华医网继续教育血液净化治疗与护理新进展题库答案.docx VIP
- 普通高中信息技术选修模块4人工智能初步 《人人都是艺术家——人工智能的简单应用》说课课件.pptx
- 三菱PLC编程手册.doc
- 江苏省建湖县建阳中学2024-2025学年八年级上学期第一次月考语文试题(解析版).docx VIP
- HP维修手册760-785 E77650E77660维修手册-英文版.pdf
- 12J8 楼梯标准图集.pdf
- 影响小米之家消费者体验及购买行为的因素分析-消费者行为心理学论文-管理学论文.docx
- 第2课 神来之笔(幻想与偶然)课件-2023-2024学年高中美术人教版(2019)选择性必修1《绘画》.pptx VIP
- 二年级语文上册-第八单元-集体备课+教材分析.pptx VIP
文档评论(0)