MES介绍及推广 大全.ppt

  1. 1、本文档共84页,可阅读全部内容。
  2. 2、有哪些信誉好的足球投注网站(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
  3. 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  4. 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
MES介绍及推广 大全

期 待 携 手 共 进 One dashboard included with 10 work cells. Multiple dashboards included with larger orders. This is a high level overview of a Lines performance. Using the chart and the colored cells in the table, it is easy to see how a Line is performing over a given time. OEE = EA * PE * QR Line Efficiency is provided as an added measure to show how the Line’s production compares with an Ideal production. Each report is equipped with a standard interface called the Global Filter to allow the selection of the available filters. Different reports have the capability of having different filters. OEE Summary will only have the Line selection and the Time Series report below will only have the Line and the Work Cell selection. Many reports you will see have all 4 selections. The Event Top 10 report is configured for custom events and it also allows the filtering of specific events for analysis. Selected filters are then listed on the report for reference. Each report is equipped with a Date / Time selection tool which allows the selection of the Start and End time frame for the data to be analyzed. Linear representation of the Work Cells in the Line to assist in identifying where problem areas are occurring across the line. When some of the work cells are Blocked because a work cell downstream is stopped then the effects of that downtime can be identified. Part Count compared to Capacity of the work cell. Average Cycle Time compared to Ideal Cycle Time Uses static costs provided at implementation to identify the cost of a work cell being down and not able to produce for a given time. Uses static costs to identify the specific cost to producing scrap parts. This demonstration will walk though the integrated activities of manufacturing a beverage product for a customer order. The integration of the follow aspects will be illustrated: Create Order Update Planning (ERP / MES integration) Finite Capacity Scheduling (MES / Scheduling integration) Goods Receipt In

文档评论(0)

zhuwenmeijiale + 关注
实名认证
内容提供者

该用户很懒,什么也没介绍

版权声明书
用户编号:7065136142000003

1亿VIP精品文档

相关文档