- 1、本文档共9页,可阅读全部内容。
- 2、有哪些信誉好的足球投注网站(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
- 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
IEEE模板格式论文
Experimental Investigation on Live Working for 1000kV AC Transmission Line
Yi Hu, Linong Wang, Guiwei Shao, Kai Liu, Yuanfang, Wen, Kangzhen Wen
(
Abstract--The overvoltage level of ultra high voltage transmission line with 1000KV altering current was analyzed, and the minimum working distance and minimum combinational gap under different overvoltage level as well as the minimum effective insulating length of insulating tools were determined by various experiments. The screen clothing which could be applied to live work for 1000kV transmission line was developed. The surface and inner electrical-field intensities of screen clothing in different work positions on the pole were measured. The safe guarding measures under different operation mode were revised. The outcomes of these investigations provide technical reference to engineering design and live line work for 1000kV transmission line.
KEY WORDS:1000kV AC transmission line;Live working;Working distance;Combinational gap;Insulating tool;Safe guarding;Screen clothing
Introduction
C
hina is about to carry out the demonstration project of power transmission of extra-high-voltage 1000kV AC. In order to provide parameters for the design of circuitry pole as well as the technical basis and the regulations standard of the live working and the overhauling maintenance, we need to make the experimental research on the live working of the 1000kV AC transmission line.
It is the first time for China to develop the research on the live working under the condition of 1000kV AC transmission line [2-4]. On the basis of each tentative data and the research results from the live working of 500kV and 750kV transmission line[5-8], this thesis has researched the work distance, the combinational gap, the work way, the work tool and the safe guarding apparatus in the live working of 1000kV AC transmission line. These research results can provide the technical basis for the engineering design as well as the live working of 1000kV AC tr
您可能关注的文档
- Flash page flip 翻頁電子書製作簡介-简体版.doc
- flash动画实例:百叶窗制作.doc
- Flash游戏编程基础教程——创建对象.doc
- Flash游戏编程基础教程——控制影片剪辑对象.doc
- Flood Maps - Louisiana:洪水地图-路易斯安那.ppt
- Fireworks制作水晶按钮教程.doc
- flash图片模板flash网站模板-如何合理利用ALT标签优化你的图片站.doc
- fluorescencecompensation - Discoveries Need Dollarsfluorescencecompensation -发现需要美元.ppt
- FOR说课稿,《FOR循环语句》说课稿.doc
- FPC介绍.ppt
最近下载
- 八年级物理上册《透镜》练习题(含答案解析) .pdf
- 插花与花艺设计(花道——插花技艺养成)智慧树知到期末考试答案章节答案2024年云南林业职业技术学院.docx
- 四书精读教学-《四书》精读课堂笔记.docx VIP
- 2022年青岛版五四制三年级上册数学典型应用题105道.pdf
- 国旗下讲话:远离垃圾食品,享受健康生活.doc
- 幼儿园课件:第八章--学前儿童的情绪和情感.pptx
- 部编版语文九年级下册课内外古诗词(共17首)阅读理解题背诵-中考考点汇总(全册-含答案).doc VIP
- 第一章立体构成概述 .ppt
- 2024年河北省继续医学教育公共选修课参考答案.pdf VIP
- 《立体构成》课件 第一章 立体构成概述.ppt
文档评论(0)