- 1、本文档共12页,可阅读全部内容。
- 2、有哪些信誉好的足球投注网站(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
- 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
Integrating design and construction through vi英文文献
Integrating design and construction through virtual prototyping
1.Introduction
A comparison of productivity data between manufacturing and construction industriesis interesting and revealing.For example,Fig.1 indicates that within last 40 years,the non-farm industries,which primarily refer to the manufacturing industry as it has a dominant share of over 80%,have made approximately 10% incremental annual improvements while the construction industry continuously declined. this phenomenon is observable in almost every country,and it may be explained by the following three differences between the two industries:
1.the construction industry does not have an effective platform to Captureand re-use knowledge generated in design and construction stages;
2.the construction industry does not have a flxed production line; and
3.the construction industry does not have the ability to try before
build.
It is necessary to note that the above differences are identified through authorsown experience and knowledge.It is expected that these can generate further research interests and discussions within the research community. The manufacturing industry adopts a decomposition model in which an artifact is decomposed into basic components which can be
designed in isolation. These basic components are frequently defined as shapeable blocks and stored in element libraries in graphical modeling systems. A new design is therefore a hierarchy of components which are modified to fit new requirements.The production process of the new design is also a slight modification of the existing process.In other words,the manufacturing industry is able to capture and re-use its knowledge indesign and production.New design and production processes are obtained through incrementally improving existing versions.The construction industry,however,does not have this capacity.A design process in construction typically starts from a blank sheet of paper.Although certain components and building details may be r
您可能关注的文档
最近下载
- 北京-EU5-产品使用说明书-EU5-BJ7000C5D3-BEV-北汽新能源EU5车型用户手册V3.pdf
- 特定场景自动驾驶,快速上行赛道值得关注_2022-05-自动驾驶.pdf
- 液氯(氯气)和氯乙烯生产企业以及过氧化企业安全风险隐患排查指南.docx VIP
- 《城市规划设计计费指导意见》2017修订版.docx
- 液氯(氯气)生产企业重点检查项安全风险隐患排查表.docx VIP
- 《作文》专题系列课件126《作文分论之_诗歌类材料作文》.ppt
- 2023年度公务员考试(公考)行政职业能力测验(行测)测试卷(附答案和解析).pdf VIP
- LittleSwan小天鹅TB36V81H 波轮全自动洗衣机 巴赫银 门盖巴赫银 波轮式 220V,1Ph 50Hz.pdf
- 广东梅州抽水蓄能电站二期环境影响报告书(送审稿).doc
- 第一讲:形势与政策课件.ppt VIP
文档评论(0)