- 1、本文档共44页,可阅读全部内容。
- 2、有哪些信誉好的足球投注网站(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
- 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
主机遥控数据和试验程序Chief C20 TEST PROCEDURE
DataChief C20
FT / FAT Procedure KG8/KG9
Department/Author: Approved by:
Operations/Bente Lise Mel?s (s) Bj?rn Marthinsen (s)
2001 KMSS AS Ship Automation
All rights reserved
No part of this work covered by the copyright
hereon may be reproduced or otherwise copied
without prior permission from
KMSS AS Ship Automation
DOCUMENT STATUS
Issue No. Date/Year Inc. by Issue No. Date/Year Inc. by A 10-Jun-99 ASJ B 1-Jul-99 ASJ C 1-Jul-99 ASJ D 1-Apr-01 ?E/BLM
CHANGES IN DOCUMENT
Issue ECO Paragraph Paragraph Heading/ No. No. No. Description of Change A First issue. B AOE-005210 The document has been updated according to new functions. C AOE-005216 Updated on request from classification society. D AOE-006905 LOS added to the procedure. Year 2000 test removed. General corrections
TABLE OF CONTENTS
Section Page
1. Introduction 1
2. General test 2
2.1 Mains Power Failure 2
2.2 Date Change in Application 2
3. Functional Test of the OCP 3
3.1 Test Purpose and Preparation 3
3.2 Lamp Test / Alarm Test 4
3.3 Mimic Display 5
4. Test of Alarm System 6
4.1 Test of On/Off Alarm-Channels 6
4.2 Test of Analogue Alarms and Acknowledge 8
4.3 Alarm-Limit/ Time Delay Change 9
4.4 Test of Alarms with Inhibit Function 10
4.5 Test of Combined Alarm and Log Printer 11
5. Test of Responsibility Transfer and Watch calling System 12
5.1.1 Watch Responsibility Transfer from ECR to Bridge. 12
5.2 Alarms 13
5.2.1 Acknowledge 13
5.2.2 Repeat Alarm 14
5.3 Call Duty Engineer 17
5.4 Watch Call During ROS Failure 18
6. Test Of Graphical User Interface 19
7. Test Of Limited Operator Access And Override 21
7.1 Alarm Acknowledge from the ROS on the Bridge or CCR 21
8. Test Of System Failures 22
8.1 Test of Communication Failures 22
8.1.1 Communication Failures on the CAN Bus 22
8.1.2 Communication Failures in Redundant CAN Bus 23
8.1.3 OCP Communi
您可能关注的文档
- 电动液压舵机认可指南.pdf
- DIFA41主机遥控系统模拟实验装置原理分析.pdf
- CRP—Z型舵桨的原理及其管理.pdf
- 安许茨自动舵参数设置.doc
- Raytheon 自动舵反馈装置Feedback_Unit.pdf
- 舵机介绍BONDIOlI HP HYDRAULIC.pdf
- 方位复视器操作手册Raytheon.pdf
- 电罗经描述与安装.pdf
- 自动舵维修保养手册.pdf
- 舵角指示器RAI900说明完整资料.pdf
- 《GB/T 32151.42-2024温室气体排放核算与报告要求 第42部分:铜冶炼企业》.pdf
- GB/T 32151.42-2024温室气体排放核算与报告要求 第42部分:铜冶炼企业.pdf
- GB/T 38048.6-2024表面清洁器具 第6部分:家用和类似用途湿式硬地面清洁器具 性能测试方法.pdf
- 中国国家标准 GB/T 38048.6-2024表面清洁器具 第6部分:家用和类似用途湿式硬地面清洁器具 性能测试方法.pdf
- 《GB/T 38048.6-2024表面清洁器具 第6部分:家用和类似用途湿式硬地面清洁器具 性能测试方法》.pdf
- 《GB/T 18238.2-2024网络安全技术 杂凑函数 第2部分:采用分组密码的杂凑函数》.pdf
- GB/T 18238.2-2024网络安全技术 杂凑函数 第2部分:采用分组密码的杂凑函数.pdf
- 《GB/T 17215.686-2024电测量数据交换 DLMS/COSEM组件 第86部分:社区网络高速PLCISO/IEC 12139-1配置》.pdf
- GB/T 13542.4-2024电气绝缘用薄膜 第4部分:聚酯薄膜.pdf
- 《GB/T 13542.4-2024电气绝缘用薄膜 第4部分:聚酯薄膜》.pdf
文档评论(0)