外文翻译----克拉斯诺亚尔斯克水电站大坝大体积混凝土温度控制.docx

外文翻译----克拉斯诺亚尔斯克水电站大坝大体积混凝土温度控制.docx

  1. 1、本文档共16页,可阅读全部内容。
  2. 2、有哪些信誉好的足球投注网站(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
  3. 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  4. 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
外文翻译----克拉斯诺亚尔斯克水电站大坝大体积混凝土温度控制

附录:英文原文TEMPERATURE CONTROL OF THE MASSIVE CONCRETEOF THE KRASNOYARSK HYDROELECTRIC STATION DAMA. P. Dolrnatov and S. Z. Neidlin UDC 627.821.2 : 666.972.021.21.035.83(282.251.2)During recent years a number of large hydroschemes with high massive concrete dams have been bnilt in areas of the USSRin an area of extreme climate. A number of problems arise in the erection of massive dams under severe climatic conditions related to the prevention of fissuring in the concrete and obtaining a monolithic structure.Typical features of the construction of large hydroschemes are the large volumes of concrete and the extremely limited time for pouring them, which means a high rate of concrete placing.Measures for controlling the temperature of the concrete on a large scale were adopted practically for the first time in the Soviet Union in the construction of the Krasnoyarsk hydrocomplex. The severe climatic conditions at the site (mean annual temperature +0.4, maximum long range temperature +37 and minimum, -54) introduced serious difficulties in obtaining monolithic mass structures and ptaced special demands on the concrete and its placement. In order to obtain monolithic concrete structures,the Technical regulations for carrying out concreting lays down the following temperature conditions for blocks with columnar section (plan dimensions 15 x 11.5 m, height 3 to 9 m):a) maximum temperature in blocks placed on fresh concrete (less than 1 month old) must not exceed 40;b) maximum temperature in blocks placed on old concrete (more than i month old) and rock must not exceed 28;c) the temperature drop between the core and faces must not exceed 23;d) temperature of the concrete at the moment when the intercolumnar construction joints solidify (cementation) must not be more than 5 in the bottom 20 meters from the foundation and 8 in the remaining mass.A number of measures were envisaged for controlling the temperature of the dam concrete, namely: the use of cements with average

文档评论(0)

pangzilva + 关注
实名认证
内容提供者

该用户很懒,什么也没介绍

1亿VIP精品文档

相关文档