HND SQA 财政预算outcome3 答案.doc

  1. 1、本文档共4页,可阅读全部内容。
  2. 2、有哪些信誉好的足球投注网站(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
  3. 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  4. 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
HND SQA 财政预算outcome3 答案

Introduction This report shows the variances of direct material total, usage, price, direct labor total, rate, efficiency, and total overhead by a table and of flexed budget. And also give the recommendation and conclusion. Flex budget Tricol Plc Flexed Budget For June 2008 Original Budget 2,000 units Flexed Budget 1,600 units Actual Results 1,600 units Variance F/A £ £ £ £ Direct materials 80,000 64,000 61,600 2,400 F Direct Labor 36,000 28,800 35,200 6,400 A Variable overheads 4,000 3,200 3,200 0 Insurance 2,200 2,200 2,400 200 A Depreciation 1,500 1,500 1,500 0 Rent and Rates 2,500 2,500 2,500 0 Administration 2,000 2,000 2,200 200 A Total 128,200 104,200 108,600 4,400 A Variances analysis The direct material usage variance is 8000(F), it shows that the flexed budget is£8,000 more than the actual cost, as a result of the using of higher-grade materials and changing of the way of production. The direct material price variance is 5600(A), which means that the actual price is£5600 more than the flexed budget price, because of the Tricol PLC had changed their supplier and purchase the higher-grade material lead to the price raised from £10 per/kg to£11 per/kg. The direct material total = direct material usage – direct material price. As calculated above, 8000-5600=2400, the direct material total variance is£2400. The direct labor rate variance is 3520(A), which means that the actual labor rate is£3520 more than the flexed budget£9 per hour to Some employees still apprentices, with poor efficiency. The direct labor efficiency variance is 2880(A), as to say, the actual labor efficiency is£2880 more than flexed budget efficiency. It may be because the machine on the production line equipment getting old and it influence the efficiency of employees at the time of production, or maybe the culture of the company is not so well at current time, which result in reduced efficiency. The direct labor total variance is 6400(A) caused by th

您可能关注的文档

文档评论(0)

xcs88858 + 关注
实名认证
内容提供者

该用户很懒,什么也没介绍

版权声明书
用户编号:8130065136000003

1亿VIP精品文档

相关文档