网站大量收购闲置独家精品文档,联系QQ:2885784924

FMC作業流程xhs.ppt

  1. 1、本文档共11页,可阅读全部内容。
  2. 2、有哪些信誉好的足球投注网站(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
  3. 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  4. 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
FMC作業流程xhs

Delta Confidential * Delta Confidential XIE HUA SHAN 11/07/2004 FMC WORK PROCESS CONTENTS FMC DEFINITION AND FUNCTION FMC WORK PROCESS FMC WORK DETAILED RULES AND REGULATIONS 1.FMC DEFINITION AND FUNCTION FMC DEFINITION: FACTORY Material Control PITCH WORK ORDER IN TIME DRAW AND PROVIDE MATERIAL IN TIME MATERIAL CONTROL AND TRACKING 3.FMC WORK DETAILED RULES: 3.1 simulate lack material 3.2 pitch work order 3.3 worker draw material 3.4 lack material tracking 3.5 abnormity solving 3.6 WIP tracking and solving Simulate lack material Before seven days 3.1.1 YP23N Run lack material 3.1.2 FMC update the time that purchaser CFM 3.1.3 tracking and deal with Afer the delivery time delay 3.1 Simulate lack material 3.2.1 CFM the time and the amount that the production product 3.2.2 YPD9 system automatism maintenance the sort of warehouse use co02 to modify the work order 1)AI/SMD Backflush material belong to the wo99 warehouse 2)the Backflush material of machining station and production line is in W199 store ,mark at the position . 3)confirm finity material and delete the material of 4010 beginning 3.2.3 List the work order with YDP09 order and tidy the work order in operation code 3.2.4 Throw the Work order and let them draw the material 1)draw AISMD work order three days before the production on AI/SMD schedule 2)throw machining and production line two days before production main line on the schedule 3)Release work order immediately after throw the work order 3.2 pitch work order 3.3 Draw material: 3.3.1 The worker fetch the bottom of the work order list after store draw the material completely 3.3.2 Check the material and confirm it right with the work order list contents ,then take the material to the area of material 3.3.3 Fill the material form with lack material, on which write the number

文档评论(0)

zhuwenmeijiale + 关注
实名认证
内容提供者

该用户很懒,什么也没介绍

版权声明书
用户编号:7065136142000003

1亿VIP精品文档

相关文档