风险管理(英文版).doc

  1. 1、本文档共5页,可阅读全部内容。
  2. 2、有哪些信誉好的足球投注网站(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
  3. 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  4. 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
风险管理(英文版)

Risk Assessment Part 1: Assessment with existing control measures A Business: …TURBINE SYSTEMS Department: …DIMENSIONAL Dept. no.: …2225 Location: …PCF Activity (or area) being assessed: …Dytel/Moore Vernon Gauges B Assessment ref. no. … Date of assessment: …31/03/04 Assessor(s)/team: …P.REEK …G.STICKA S.SARGEANT … People Rolls-Royce: 8 Frequency/duration: 8hs 3shfts affected: Others: 0 Frequency/duration: N/A Periodic reviews – maximum intervals for activities with: Medium risk (but ALARP) - annually Low risk - three-yearly 1st Review Date: 31/03/05 Name: P.REEK Signed: 2nd Review Date: Name: Signed: 3rd Review Date: Name: Signed: 4th Review Date: Name: Signed: Hazard (potential for harm) Hazardous event (what happens) Foreseeable cause (cause of hazardous event) F Consequence (outcome) Existing control measures used Probability 1 to 5 Risk 1 to 25 Details of harm Value 1 to 5 Example: Working at height Fall from ladder Loss of balance Broken limbs 3 Ladder in good condition, at correct angle and tied off 3 9 medium 1Trapped Hand Fixture closing on components Unsafe working practices Broken fingers 1 Safe procedures,Machine integrated 1 2 2Operation of machine RSI Continuous loading unloading of components Wrist backache 2 Intermittent breaks 3 6 3Visual imparement Examining results on display screens Continuous use of DSE Gradual deteration of eyesight 3 DSE legislation, not a continuous process 2 6 4Noise General factory noise Finish area extraction machine noise Gradual hearing impairment 3 Area is ppe controlled hearing protection must be worn 2 6 5Physical injury Dropping of tooling fixtures unsafe working practices Bruises abrasions, possible broken fingers 1 Operator training 1 2 6Hand held tooling vibration Vibration white finger from moving parts Continuous use of air tools Vibration white finger 2 An

文档评论(0)

xcs88858 + 关注
实名认证
内容提供者

该用户很懒,什么也没介绍

版权声明书
用户编号:8130065136000003

1亿VIP精品文档

相关文档