008-COORDINATION AND NOTIFICATION协调和通知程序.doc

008-COORDINATION AND NOTIFICATION协调和通知程序.doc

  1. 1、本文档共6页,可阅读全部内容。
  2. 2、有哪些信誉好的足球投注网站(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
  3. 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  4. 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
008-COORDINATION AND NOTIFICATION协调和通知程序

COORDINATION AND NOTIFICATION 协调和通知 ISSUE REV ISSUE OR REVISION DESCRIPTION ORIGIN BY DATE CHK’D BY DATE APP’D BY DATE R00 ORIGINAL INDEX 目录 purpose 目的 SCOPE 范围 defination 定义 PROCEDURE程序 Attachment 附录 1 PURPOSE 目的 To establish the procedure to ensure that individual project avoids causing the employees being injured by (radiography etc) and impacting the operation of other projects when it implements certain high risk work,. 为了确保各个项目在实施某些高风险作业时避免不必要的人员受伤(射线作业等)和影响其他的项目运作,特制定本程序. SCOPE 范围 The procedure applies to all PC project work and employees. 本程序适用于所有的PC 项目作业和人员。 DEFINE定义 Normal work time正常工作时间:From 7:00 - 19:00 (summer season :May- October) Monday to Saturday From 7:00 –18:00 (winter season: November-April) NIGHT SHIFT WORK夜班作业: Everyday after19:00(summer season May- October) Everyday after 18:00(winter season November – April) OVERTIME 加班作业:From Monday to Saturday after 19:00 and Sunday all day (summer season May-October) PROCEDURE 程序 For some kinds of high risk works, such as radiograph/heavy lifting /blocking the traffic/ excavation outside project will impact other projects. The contractor who implements the high risk work should submit the NOTIFICATION to BTSS project HSE department or BTSS safety manager previously. BTSS safety manager will be responsible for coordinating and communicating within whole PC project to prevent unrelated personnel entering into the work area and being injured. At the same the communication can avoid the cross operation which will result the incident. 对于某些高风险的工作,如射线作业、重型吊装、堵塞交通作业和的超出项目范围开 挖等会影响到其他项目的施工作业,因此承包商必须提前向BTSS 项目HSE和 BTSS 安全经理递交通知单,由BTSS安全经理负责在整个PC 项目之内进行协调和 沟通。确保高风险的作业进行时,不会由于人员意外得进入施工区域而受伤。同时也 避免发生交叉作业导致事故发生。 4.1 OUT OF NORMAL WORK加班工作 If the

文档评论(0)

xcs88858 + 关注
实名认证
内容提供者

该用户很懒,什么也没介绍

版权声明书
用户编号:8130065136000003

1亿VIP精品文档

相关文档