FIDIC红皮书中承包商遭受延误和(或)招致费用增加的处理
Contractor Suffers Delay and/or Incurs CostClauseconditionTimeCostProfit1.9Delayed Drawings and InstructionsIf the Contractor suffers delay and/or incurs Cost as a result of a failure of the Engineer to issue the notified drawing and instruction within a time which is reasonable and specified in the notice with supporting details…√√√2.1Right of Access to the SiteThe Engineer shall give the Contractor right of access to, and possession of, all part of the Site within the time (or times) stated in the Appendix to Tender.If the Contractor suffers delay and/or incurs Cost as a result of a failure by the Employer to give any such right of possession within such time…√√√4.7Setting OutThe Contractor shall set out the Works in relation to original points, lines and levels of reference specified in the Contract or notified by the Engineer.The Employer shall be responsible for any error in these specified or notified items of reference.If the Contractor suffers delay and/or incurs Cost from executing work which was necessitated by an error in these items of reference , and an experienced contractor could not reasonably have discovered such error and avoided this delay and/or Cost…√√√4.12Unforeseeable Physical ConditionsIn this Sub-Clause, “physical conditions” means natural physical conditions and man-made and other physical obstructions and pollutants, which the Contractor encounters at the Site when executing the Works, including sub-surface and hydrological conditions but excluding climatic conditions.If the Contractor encounters adverse physical conditions which he considers to have been Unforeseeable, the Contractor shall give notice to the Engineer as soon as practicable.If and to the extent that the Contractor encounters physical conditions which are Unforeseeable, give such a notice, and suffers delay and/or incurs Cost due to these conditions…√√4.24FossilsAll fossils, coins, articles of value or antiquity, and structures and other remains items of geological or arch
您可能关注的文档
- 细数国外生活地道口语表达.doc
- 教学设计整合-Module 4 A Social Survey--My Neighbourhood.doc
- 四级写作过关系列:每天10个句子英文写作佳句300例.doc
- 各种能吃的东西的英文对照名字.doc
- 朗文少儿英语基础级经验分享.doc
- 英美文学 谭淑明.docx
- 美国高中生英文水平的100个单词.docx
- 老友记 日常用语.doc
- 专转本英语上课讲义.doc
- 朗文口语考试TOPIC.docx
- 四川省德阳市罗江中学2025届高三考前热身化学试卷含解析.doc
- 山东省枣庄现代实验学校2025届高三下学期第五次调研考试化学试题含解析.doc
- 吉林省长春市十一高中等九校教育联盟2025届高三一诊考试生物试卷含解析.doc
- 2025届江苏省盐城市伍佑中学高考仿真模拟化学试卷含解析.doc
- 2025届广西贺州中学高考冲刺押题(最后一卷)生物试卷含解析.doc
- 安徽省池州市贵池区2025届高三第一次模拟考试生物试卷含解析.doc
- 宁夏银川一中2025届高三(最后冲刺)化学试卷含解析.doc
- 广东省广州市增城区四校联考2025届高考压轴卷化学试卷含解析.doc
- 2025届邯郸市第一中学高考生物必刷试卷含解析.doc
- 2025届安徽省安庆市石化第一中学高考仿真卷化学试卷含解析.doc
文档评论(0)