FIDIC可变更,索赔,调价事项归纳与对比
可变更事项对比
条款 内容 可否变更 黄皮书 银皮书 3.3 Instructions of the Engineer(银皮书为3.4 Instructions) The Engineer may issue to the Contractor (at any time) instructions which may be necessary for the execution of the Works and the remedying of any defects, all in accordance with the Contract. The Contractor shall only take instructions from the Engineer, or from an assistant to whom the appropriate authority has been delegated under this Clause. If an instruction constitutes a Variation, Clause 13 [Variations and Adjustments] shall apply. 是 是 4.6 Co-operation The Contractor shall, as specified in the Contract or as instructed by the Engineer, allow appropriate opportunities for carrying out work to:
(a) the Employer’s Personnel,
(b) any other contractors employed by the Employer, and
(c) the personnel of any legally constituted public authorities,
who may be employed in the execution on or near the Site of any work not included in the Contract.
Any such instruction shall constitute a Variation if and to the extent that it causes the Contractor to incur Unforeseeable Cost. Services for these personnel and other contractors may include the use of Contractors Equipment, Temporary Works or access arrangements which are the responsibility of the Contractor. 是 是 4.12 Unforseeable Physical Conditions(银皮书表述为Unforseeable Difficulties) If the Contractor encounters adverse physical conditions which he considers to have been Unforeseeable, the Contractor shall give notice to the Engineer as soon as practicable.
This notice shall describe the physical conditions, so that they can be inspected by the Engineer, and shall set out the reasons why the Contractor considers them to be Unforeseeable. The Contractor shall continue executing the Works, using such proper and reasonable measures as are appropriate for the physical conditions, and shall comply with any instructions which the Engineer may give. If an instruction constitutes a Variation, Clause 13 [Variations and Adjustments] shall apply.
您可能关注的文档
最近下载
- Q SCQ 005-2017_饲料级L-赖氨酸硫酸盐.pdf
- 初中物理学法指导.pptx VIP
- 2024年装饰装修施工员专业知识考试题库(浓缩500题).docx
- 大学生职业规划大赛《会计学专业》生涯发展展示PPT.pptx
- 物理学法指导.ppt VIP
- 公需课答案执行力与创新服务力题库.pdf
- 部编版四年级上册《麻雀》说课课件.pptx VIP
- 人教版(2019)选择性必修 第一册Unit 1 People of Achievement 单元集体备课教案.docx
- 湖南省长沙市天心区2024-2025学年九年级上学期开学考试语文试卷.docx VIP
- Q320582 ZD028-2020预应力混凝土实心方桩(螺锁式连接、焊接连接).docx
文档评论(0)