QULITY MANAGEMENT PROCEDURES质量管理
XII.QUALITY MANAGEMENT PROCEDURES
Purpose:
The purpose of this procedures is to outline the construction quality assurance program of the project of Avic residential development. This procedure will give an overview of the program, describing overall responsibilities.
Quality Assurance:
The primary function of quality assurance is to obtain competed construction that meets all contract requirements. Assurance is defined as a degree of certainty. Quality assurance personnel continually assure or make certain that the contractors work complies with contract requirements.
RESPONSIBILITIES
The Contractor is responsible for performing the work in accordance with all aspects of the Contract. At a minimum, the Contractor shall perform testing and inspection in accordance with this Construction Quality Plan.
None of the Contractor’s quality staff have the ability to deviate from Project requirements or to interpret Project specifications. Their role is solely to ensure the finished Work meets the requirements of the Contract. Quality staff has the authority to stop any and all Work that does not meet the Contract requirements.
Scope:
This procedure sets forth the construction quality program requirements that are to be applied to work performed by Shanxi Construction Engineering (Group) Corp.
Quality Assurance Personnel: The role of quality assurance personnel is to assure that the CQC (Contractor Quality Control) system is functioning properly.
Examine the quality control methods being used to determine if the contractor is properly controlling design activities in design build contracts
Examine the quality control methods being used to determine if the contractor is properly controlling construction activities.
Make certain that the necessary changes are made in the contractors QC system, if excessive construction deficiencies occur.
Assist the contractor in understanding and implementing the contract requirements.
Examine ongoing and completed work.
Review Qual