粪便处理法规及未来发展技术.docx

  1. 1、本文档共6页,可阅读全部内容。
  2. 2、有哪些信誉好的足球投注网站(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
  3. 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  4. 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
粪便处理法规及未来发展技术

1. stool handling, collection, transport regulations and management practices1.1 stool disposal regulations1.1.1 General provisions stool handling requirements:(a) without the safe disposal of faeces it can not be directly used as agricultural fertilizer. By fecal harmless treatment should be consistent with the relevant provisions of the current national stool sanitary standards (GB7959) of.(b) should complete monitoring, testing equipment and systems, the treated manure should be regularly tested, does not meet the criteria, should be re-treated until it meets the standards.(c) excreta disposal should be carried out in a closed state, not bare stool odor non-proliferation.(d) the residue generated in the process of the stool, and concentrated or dehydrated manure sludge, should be harmless treatment; prolapse after concentrated manure should be harmless or pre-treated sewage into the pipe network, centralized processing by the sewage treatment plant.(e) clear Amoy fecal residue should be closed transport into the stool sample processing station centralized processing, non-random process.(f) faecal sewage treatment before discharge into surface water, water quality should comply with their emissions on existing national regulations, Integrated Wastewater Discharge Standard (GB8978) .(g) Hospital manure wastewater treatment, should follow the medical institutions water pollutant discharge standards (GB18466-2005) existing national provisions.1.1.2 excreta disposal station shall comply with the general requirements of 1.1.1, it must also meet the following requirements: (a) stop the feces directly through the septic tank should be discharged into septic tanks, into the fecal-oral and fecal-slot should be no fecal residue. After unloading manure, should be Gaiyan fecal-oral, fecal groove.The residue (b) should be pretreated collected in a closed container, and sound processing, can not bare stacking. (c) by the sludge digestion process should be good stability, no odo

文档评论(0)

xcs88858 + 关注
实名认证
内容提供者

该用户很懒,什么也没介绍

版权声明书
用户编号:8130065136000003

1亿VIP精品文档

相关文档