管涵施工技术方案(英文).doc

  1. 1、本文档共10页,可阅读全部内容。
  2. 2、有哪些信誉好的足球投注网站(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
  3. 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  4. 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
管涵施工技术方案(英文)

Contents ChapterⅠ Compilation Introduction Compilation Proof Compilation Principle ChapterⅡ The General Situation of the Project and the Schedule for Construction Work The General Situation of the Project The Schedule for Construction Work ChapterⅢ Construction Work Progress Construction Work Process Preparation Work for Construction Chapter Ⅳ Safety Ensuring and Environment Protection Safety Ensuring Measures 2. Environment Protection Measures ChapterⅠ Compilation Introduction Compilation Proof (1). The Bidding Document for Western Regional Road Corridor Development Project, Package1. (2). Construction Design Drawings for Teemeen Khuzuu Hill to Baga Ulaan Pass 110.8KM Road. (3). Road Construction Specifications in Mongolia. (4). Relative Demands from Employer and Engineer Consultants. Compilation Principle (1). Compilation According to Design Document, Bidding Document and Construction Specifications. (2). Working Period has taken the general demand from Employer and the influence brought by rainy season into consideration. Every construction item will obey the General Construction Work Plan in order to achieve the best goal with the minimum cost and to make sure the quality, safety and benefit. (3). Working Schedule will focus on the construction process, parallel work organization, assembly line working, and mutual cooperation among different departments. Non-working and re-working situations will be forbidden. ChapterⅡ The General Situation of the Project and the Schedule for Construction Work The General Situation of the Project The total length of the pipe culvert designed for Teemeen Khuzuu Hill to Baga Ulann Pass 110.8KM Road is 3415M, of which the length with the diameter 1M is 2792M, with the diameter 1.2M is 221M and with the diameter 1.5M is 402M. The Schedule for Construction Work (1).Organization Arrangement Construction work will be in the charge of Vice Production Manager. Chief Engineer is the Technical Guide toget

文档评论(0)

xcs88858 + 关注
实名认证
内容提供者

该用户很懒,什么也没介绍

版权声明书
用户编号:8130065136000003

1亿VIP精品文档

相关文档