管涵施工技术方案(英文)
Contents
ChapterⅠ Compilation Introduction
Compilation Proof
Compilation Principle
ChapterⅡ The General Situation of the Project and the Schedule for Construction Work
The General Situation of the Project
The Schedule for Construction Work
ChapterⅢ Construction Work Progress
Construction Work Process
Preparation Work for Construction
Chapter Ⅳ Safety Ensuring and Environment Protection
Safety Ensuring Measures
2. Environment Protection Measures
ChapterⅠ Compilation Introduction
Compilation Proof
(1). The Bidding Document for Western Regional Road Corridor Development Project, Package1.
(2). Construction Design Drawings for Teemeen Khuzuu Hill to Baga Ulaan Pass 110.8KM Road.
(3). Road Construction Specifications in Mongolia.
(4). Relative Demands from Employer and Engineer Consultants.
Compilation Principle
(1). Compilation According to Design Document, Bidding Document and Construction Specifications.
(2). Working Period has taken the general demand from Employer and the influence brought by rainy season into consideration. Every construction item will obey the General Construction Work Plan in order to achieve the best goal with the minimum cost and to make sure the quality, safety and benefit.
(3). Working Schedule will focus on the construction process, parallel work organization, assembly line working, and mutual cooperation among different departments. Non-working and re-working situations will be forbidden.
ChapterⅡ The General Situation of the Project and the Schedule for Construction Work
The General Situation of the Project
The total length of the pipe culvert designed for Teemeen Khuzuu Hill to Baga Ulann Pass 110.8KM Road is 3415M, of which the length with the diameter 1M is 2792M, with the diameter 1.2M is 221M and with the diameter 1.5M is 402M.
The Schedule for Construction Work
(1).Organization Arrangement
Construction work will be in the charge of Vice Production Manager. Chief Engineer is the Technical Guide toget
您可能关注的文档
最近下载
- QB_T 4563-2013金砂糖.pdf
- 大坝安全监测系统运检导则(试行) QGDW 46 10022.24-2020.docx VIP
- 第五单元 一方水土养一方人 达标训练(含答案) 浙江省人教版七年级人文地理下册.docx
- 奋进新征程建功新时代PPT模板.ppt VIP
- 规范《GB712-88-船体用结构钢》.pdf
- 二年级上册语文教学设计21《狐假虎威》一等奖 刘芳 部编版.docx VIP
- Q_GDW 46 10022.25-2020 通风空调系统运检导则.docx
- 12如何帮助学生学会正确地与异性同学交往?.docx VIP
- 专题1.2 数轴与动点经典题型(四大题型)(原卷版).docx VIP
- 拉森钢板桩专项施工方案.doc
文档评论(0)