- 1、本文档共27页,可阅读全部内容。
- 2、有哪些信誉好的足球投注网站(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
- 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
外文文献翻译 中英文对照 成本管理计划支持系统工程造价控制策划和规划的新范例
COMPASS-NEW PARADIGM FOR PROJECT COST CONTROL STRATEGY AND PLANNING
By Makarand Hastak/ Associate Member, ASCE, Daniel W. Halpin,2 Member, ASCE, and Jorge Vanegas/ Associate Member, ASCE
ABSTRACT: The need to remain competitive while generating profit requires management to develop innovative. cost management strategies that will allow them to distinguish and control early-on factors that might adversely. impact the cost of a project.
This paper describes a decision support system, COMPASS (Cost Management Planning Support System) for project cost control strategy and planning. Throughout the life cycle of a project, COMPASS methodology assists management in evaluating the potential degree of cost escalation. It also identifies attributes such as management errors, regulatory approval, and error/rework, that might be the cause for project cost escalation. Furthermore, COMPASS assists management in formulating a cost control strategy while utilizing their experience and past project performance data. The attributes identified by the cost control strategy, if controlled, would minimize the expected loss.
INTRODUCTION
Project ost scalation and cost management are clearly two of the most important management concernsin the intensely competitive environment of the construction industry. Consequently, it s very important for management to detect at an early stage of a project the actual or potential cost overruns. To remain competitive while generating profit, management needs to identify and adopt in novative cost management strategies. These strategies should allow them to identify and control early on factors that might adversely impact the cost of a project.
To date, various methodologies have been developed for project cost control such as earned value system management. exception reporting, and cost trend analysis. However, none of these methods considers at a macro l
您可能关注的文档
最近下载
- 2023税务局大比武数字人事“两测”练习专业能力-行政管理考试题库及答案.pdf
- 2023北京北师大二附中高一(上)期中化学试卷含答案.docx
- 小学数学拓展提高(行程问题——追及问题)精选应用题30个.doc
- 《原子的结构》说课稿.docx VIP
- 2024-2028年2024-2029年中国高蛋白饲料行业供需趋势及投资风险研究报告.docx
- 成都城投集团笔试题目.pdf
- 2022高三联考作文“择一事,终一生”精准审题指导素材及优秀范文四篇.docx
- 必威体育精装版班主任艺术:做一个幸福的班主任(共50张PPT).ppt
- 《控制图+第3部分:验收控制图GBT+17989.3-2020》详细解读.pdf
- 人教版八年级物理上册全册大单元教学解读课件.ppt
文档评论(0)