陕西省西咸新区空港新城沣泾大道道路及排水工程招标施工组织设计
目 录
施工组织设计·······················································5
第一章:工程概述···················································5
一、工程编制依据···············································5
二、编制原则···················································5
三、工程概况···················································6
四、施工技术要求···············································6
第二章:施工总体布署···············································7
一、施工准备工作···············································7
1.现场组织机构··············································7
二、施工总体规划···············································7
1.总工期安排················································7
2.管理方针··················································8
3.施工总体布署··············································8
4.临时工程··················································9
①临时用水················································9
②临时用电················································9
③临时设施················································9
第三章:拟投入本工程的主要施工机械及进场计划·······················9
一、项目部任务划分及进度安排···································9
二、施工机械准备················································10
1.机械准备情况及表·········································10
2.材料准备情况及表·········································11
3.劳动力安排计划表·········································12
第四章 主要项目的施工方案及施工方法································13
一、路基工程····················································13
(一)2.2工程安全目标··········································44
3 .本工程安全工作重点········································44
4.安全管理体系·············································44
4.1建立完善的安全管理组织机构····························45
4.2合理配置专职安全管理人员······························45
4.3建立完善的安全管理制度································45
4.3.1安全生产责任制······································45
4.3.2安全技术交底责任制度································47
4.3.3安全教育制度········································47
4.3.4安全检查制度········································47
4.3.5安全员跟班作业制度··································47
4.3.6