- 1、本文档共75页,可阅读全部内容。
- 2、有哪些信誉好的足球投注网站(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
- 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
Oracle ERP 培训—计划管理模块
Understand how total lead times are rolled up to give the different total cumulative lead times depending on stocking levels of subassemblies and purchased components. Total Lead Time Preprocessing lead time plus processing lead time for an item Used by Oracle Master Scheduling/MRP as on option when defining time fences. Cumulative Manufacturing Lead Time Processing lead time plus critical path subassembly processing lead times. The time required to build an item if all purchased components are stocked, but subassemblies must be built level by level. Used by Oracle Master Scheduling/MRP as an option when defining time fences. Cumulative Total Lead Time Processing lead time plus critical path subassembly and purchased component processing lead times. The time required to build an item if purchased components must be purchased and subassemblies must be built level by level Used by Oracle Master Scheduling/MRP as an option when defining time fences. Order Modifier An item attribute that controls the size of planned orders suggested by the planning process in line with your inventory policies. Minimum Order Quantity Define a minimum production or purchasing quantity For example, when an item has high set-up costs, capacity limitations, or because if is simply not economical to build or purchase the item in small quantities: Net Requirements = 50, Minimum Order Quantity = 100, Planned Order = 100. Maximum Order Quantity Define a maximum production or purchasing quantity. If net requirements exceed the maximum order quantity, the planning process suggests multiple planned orders. For example, represents production, warehouse, or transportation capacity constraints: Net Requirements = 200, Maximum Order Quantity = 150, Planned Order Quantities = 150 + 50. Fixed Lot Multiple Define a production or purchasing quantity, where the planning process must suggest planned orders for the defined quantiy or multiples of the defined quantity. For example, when a vendor can
您可能关注的文档
- 国际商法第六章代理法.ppt
- 国门商业中心区开发总体设想之建筑形态及功能具化研讨方案.doc
- 国际广场写字楼整体营销策划方案93.ppt
- 国际投资风险防范分析与策略.pdf
- 国际市长大厦策略案.ppt
- 国际招投标中文范本.doc
- 国际收支失衡及其调节的案例分析及作业.doc
- 国际收支的记录.doc
- 国际城推广方案.ppt
- 国际国内创意园区案例分析2009.pdf
- 党员领导干部在理论学习中心组主题会议上的发言材料汇编(6篇).docx
- 2023年行政执法工作计划汇编(4篇).docx
- 国企领导干部学习董事长在新提任干部讲话精神心得汇编7篇.docx
- 学习《著作选读》第一卷、第二卷心得体会汇编(9篇).docx
- 关于切实做好国庆期间安全生产工作的通知汇编(5篇).docx
- 在2023年招商引资推介会上的推介词汇编(5篇).docx
- 医院年终工作总结汇编(共10篇)官方抖音号:笔尖耕耘.docx
- 2022年度镇和开发区书记抓基层党建工作述职报告汇编(7篇),提纲值得参考!1.docx
- 教育主题经验交流材料汇编(5篇).docx
- 在党内主题教育专题推进会议上的讲话汇编(3篇).docx
文档评论(0)