Study on the treatment of domestic wastewater by anaerobi baffled reactor厌氧折流板处理生活污水研究.doc

Study on the treatment of domestic wastewater by anaerobi baffled reactor厌氧折流板处理生活污水研究.doc

  1. 1、本文档共4页,可阅读全部内容。
  2. 2、有哪些信誉好的足球投注网站(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
  3. 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  4. 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
Study on the treatment of domestic wastewater by anaerobi baffled reactor厌氧折流板处理生活污水研究

Study on the treatment of domestic wastewater by anaerobic baffled reactor Abstract: The experiment for the treatment of synthesized domestic wastewater by anaerobic baffled reactor (ABR) was conducted at room temperature. The findings indicated that the ARB reached the best removal rate at temperature of 25℃ and hydraulic retention time (HRT) of 24 h. HRT, water temperature, organic loading rate and influent concentration are the major factors influencing the removal rate and decreasing the HRT and increasing the organic loading rate caused the decreased chemical oxygen demand (COD). Keyword: ABR; anaerobic treatment; domestic wastewater; influence factor Introduction High-rate anaerobic technology, having the merits of energy-saving, low production of activated sludge, is a type of sustainable development wastewater treatment technology and has been widely used in the treatment of high concentrations of organic wastewater. ARB, for instance, has attracted a lot of attention for its simple structure, high removal rate, quick set up and stabile operation. The biggest character of ARB lies in its up and down baffle, with which the influence can travel in both rooms, making the bacteria live in different location and the gas release easily. ABR set-up experiment Set-up style For ARB, the start-up styles are as follows: high loading rate and low loading rate set-up. The high loading rate is taken in the present experiment. ABR set-up process The set-up time chose at mid-April with the room temperature of about 18℃ and the temperature keeps increase and it was probe to set up. The set-up started at fourth April and ends at fifth July, about a month it takes. Acclimation of sludge Acclimation of sludge stage, operated at low loading rate, is a process cultivated the needed sludge. Based on the previous studies, the acclimation of anaerobic sludge takes more time. The acclimation stage starts at April and the temperature is about 15-23℃ and keeps increasing, good for the

文档评论(0)

xcs88858 + 关注
实名认证
内容提供者

该用户很懒,什么也没介绍

版权声明书
用户编号:8130065136000003

1亿VIP精品文档

相关文档