- 1、本文档共5页,可阅读全部内容。
- 2、有哪些信誉好的足球投注网站(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
- 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
4台以上并机方案(英文)
For upto 4 units in parallel , this is exactly like say 2 or 3 units in parallel. Say for 4 x 480 KVA configurations - you will need:
DP3480E - 4 units
Parallel Card for DP3480E - 4 units (1 sitting inside each unit)
MCCB Box - 4 units (1 for each UPS)
Service Bypass for 4 x DP3480E - 1 unit (specify redundant n+1 or full power i.e. whether load is 480 x 3 KVA or 480 x 4 KVA)
Electronic Static Switch - Built in every unit (no need to add deperately)
The diagram will be exactly same as for 2 or 3 x DP3480E or 4 x DP3480E.
For more than 4 units, we shall need an External Static Switch - so the things will change to:Say for 6 x 480 KVA
DP3480E - 6 units
Parallel Card for DP3480E - 6 units (1 sitting inside each unit)
MCCB Box - 6 units (1 for each UPS)
Service Bypass for 6 x DP3480E - 1 unit (specify redundant n+1 or full power i.e. whether load is 5 x 480 KVA only or 6 x 480 KVA - in example below it is 5 x 480 KVA)
Electronic Static Switch - External to be capable of handling full power of load (say 6 x 480 KVA for full power or 5 x 480 KVA for redundancy - in example below it is 5 x 480)
This diagram will look something like:
In this option, the load is 5 x 480kVA = 2,400 kVA, which can be handled by 5 UPS modules. The 6th module is parallel operating and sharing the load in redundant operation.
Normally on full load operation, each of the 6 UPS active modules is running at 5/6th i.e. about 85% load only.
An external Static Switch is used to handle any overloads outside the rating of Online Operation or failure of more than 1 module. The Static Switch is rated for 5 x 480 KVA load.
A single line drawing is attached below to give an impression of the arrangement.
PARALLEL OPERATION OF DP300E
Sambhaji Wagh APC, Singapore
In DP300E systems parallel operation works as follows
We can connect upto nine units of same capacity in parallel to achieve redundancy or increased load capacity in UPS system. The configuration will look as follows
We have supplied this kind o
您可能关注的文档
- oracle 备份与恢复实验总结.docx
- 信用正有关词汇.doc
- PDMS英语词汇.doc
- 中英广告修辞对比.doc
- EMC RecoverPoint与FalconStor CDP的比较.doc
- 在mount状态下恢复数据文件system表空间.doc
- 水家电市场调查.doc
- 数据库空间调整方案.doc
- 剑桥商务英语课文辅导6a reporting results.doc
- DRP系统学习笔记.doc
- 中考语文复习专题二整本书阅读课件.ppt
- 中考语文复习积累与运用课件.ppt
- 2025年初中学业水平考试模拟试题(二)课件.ppt
- 四川省2015届理科综合试题48套第12套.pdf
- 【课件】战争与和平—美术作品反映战争+课件-2024-2025学年高中美术湘美版(2019)美术鉴赏.pptx
- 【课件】青春牢筑国家安全防线 课件 2024-2025学年高中树立总体国家安全观主题班会.pptx
- 【课件】原始人的创造+课件高中美术湘美版(2019)美术鉴赏.pptx
- 上海证券-美容护理行业周报:流量加快去中心化,强运营头部品牌影响较小 -2024-.pdf
- T_CSEIA 1005—2023_能源工业互联网平台数据治理要求.pdf
- T_CDSA 504.16-2023_急流救援技术培训与考核要求.pdf
最近下载
- 梁开洞计算(圆形洞口).xls VIP
- 浙江省G5联盟2024-2025学年高一上学期期中联考物理试题.docx VIP
- 2025年 (一季度)专题党课讲稿:坚守底线廉洁从政以忠诚担当的干劲加强队伍党风廉政建设.pdf VIP
- 在线网课学习课堂《沟通心理学(黑龙江工商学院 )》单元测试考核答案.docx
- 沙滩垃圾清理机论文.docx VIP
- 认识东、南、西、北(说课稿)-2024-2025学年二年级下册数学苏教版[001].docx
- 余甘子种植技术规范.pdf VIP
- 一次函数图象与坐标轴围成的图形面积.ppt
- 初中道德与法治教师教学能力水平考核测试试题(含答案).docx
- 《体重管理与健康生活》课件.ppt VIP
文档评论(0)