某著名设计公司的高尔夫球场施工规范
TECHNICAL SPECIFICATIONS
INDEX
No. of Pages
TURFGRASS NURSERY CONSTRUCTION 2
GOLF COURSE SURVEY STAKING AND LAYOUT 6
PART2-PRODUCT AND EXECUTION 6
CLEARING AND GRUBBING 8
GOLF COURSE ROUGH GRADING 11
GOLF COURSE FINE GRADING 16
GOLF COURSE FINE GRADING 16
GOLF COURSE TEEING AREA CONSTRUCTION 21
GOLF COURSE PUTTING GREEN CONSTRUCTION 26
GOLF COURSE SAND BUNKER CONSTRUCTION 34
GOLF COURSE SEEDBED PREPARATION AND PLANTING 38
TURFGRASS NURSERY CONSTRUCTION
PART 1 – GENERAL
Conditions: Requirements of the General Conditions are a part of and apply to all the work of this Section.
Work Included:
There are no construction drawings for this section
Scope of this Specification shall be the preparation of the site including clearing and grubbing procurement, transportation, and delivery of stolons; preparation for planting including soil tests, provision of seedbed mix, and temporary water system; planting of the stolons; fertilization, and maintenance of the area. The area shall consist of a total of 5 ha (5000㎡) or 12.35 acres divided into two areas: one/half ha (1.25 acres) for the growth of certified Tifway 419 Hybrid Bermudagrass/Greenlees Park bermudagrass.
Related Work:
Clean-up: The Contractor(s) shall be responsible for full clean-up of the site on a continuing basis. The Contractor(s) shall provide receptacles for debris and rubbish and be responsible for hauling and disposing off-site in a manner acceptable to the Project Manager. Upon completion of all work under the Contract, the Contractor will be responsible for final clean-up of the project work surface to be cleaned as determined by the Project Manager. All debris shall be disposed of a sites or in methods approved in advance by the Project Manager.
Irrigation: Contractor shall supply a temporary irrigation system to the nursery area. The source of water to be used shall be in ample supply and be available on a dependable basis.
Quality Assurance:
Substitutions: No substitutions are allowed in this sec
您可能关注的文档
- 构图形式.ppt
- 构建10086热线智能语音交互式自助服务系统.doc
- 构建基于数字旅游一体化服务的旅游景区整合营销服务平.doc
- 林业调查设计人员工作手册.doc
- 构建海关多元化保税仓储物流监管体系 促进现代国际物流健康发展.ppt
- 林伟贤-魅力口才第1-10集讲义全.ppt
- 林分生长量测定.doc
- 林地流转森林资源调查报告.doc
- 构音检查表.doc
- 果德安 植物油脂和提取物标准增修订内容介绍.ppt
- 部编版八年级上册历史复习第一单元中国开始沦为半殖民地半封建社会训练题.docx
- 2024_2025学年高中历史第三单元资产阶级政治家第10课革命的先行者孙中山2教学教案岳麓版选修4.doc
- 2025届高考历史统考一轮复习课后限时集训4专制集权的不断加强含解析岳麓版.doc
- 2025届高考数学试卷专项练习12三角函数与解三角形含解析.doc
- 2025届高考生物一轮复习专题重组卷第一部分单元检测卷十生物技术实践含解析.doc
- 2025届高考政治一轮复习素养测评二十六文化创新含解析.doc
- 2024_2025学年新教材高中政治第二单元人民当家作主6.2民族区域自治制度教案部编版必修3.docx
- 2024_2025学年新教材高中地理第四章区际联系与区域协调发展4国际合作教案新人教版选择性必修2.doc
- 2025届高考数学第二次模拟试卷三理含解析.doc
- 2025版高考英语一轮复习必修3Module6OldandNew学案含解析外研版1.doc
文档评论(0)