通用的GP-12程序初期生产遏制.doc

  1. 1、本文档共7页,可阅读全部内容。
  2. 2、有哪些信誉好的足球投注网站(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
  3. 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  4. 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
通用的GP-12程序初期生产遏制

NOTE: GP-12 “Early Production Containment” (GM-1920) has been incorporated into the General Motors Specific Section of the “Production Part Approval Process” procedure. Reference the Global Supplier Quality Manual (GM1927) – APQP Task 14. 注:GP-12“早期生产遏制”(GM-1920)与通用汽车“生产件批准过程”程序的规定章节是一体的。引用全球供应商质量手册(1927)-APQP任务14 SCOPE: GP-12 is to be used for all pre-production, production, service and accessory part requirements that; 1.0范围:GP-12用于所有的初始生产、批产、服务和配套件要求; Require Production Part Approval Process (PPAP) 有PPAP要求的 Represent significant risk to the customer facility as mandated by GM 受通用委托的顾客工厂出现重大风险 DEFINITION AND PURPOSE: 2.0定义和目的: GP-12 Early Production Containment requires a Pre-Launch Control Plan that is a significant enhancement to the suppliers production control plan and raises the confidence level to ensure that all products shipped will meet GM’s requirements. The pre-launch control plan will also serve to validate the production control plan. The Pre-Launch Control Plan should take into consideration all known critical conditions of the part as well as potential areas of concern identified during PPAP. GP-12早期生产遏制要求一个试生产控制计划,该计划能够显著充实供方的生产控制计划以及提高可靠度来确保发运的所有产品满足通用的期望。试生产控制计划也用来验证生产控制计划。试生产控制计划不仅关注所有已知的零件的规定条件,还关注生产件批准过程期间识别的相关的潜在区域。 The purpose of GP-12 is to: GP-12的目的是 Validate the supplier’s production control plan 确认供应商的生产控制计划 Protect our assembly and manufacturing centers and service part warehouses from quality non-conformances during critical periods 在关键期内,从质量不合格方面保护我们的装配制造中心和服务件仓库 Document the suppliers efforts to verify control of its processes during start-up, acceleration, after revisions to the manufacturing process, or when manufacturing runs are separated by 3 months or more 生产开始和加速阶段、制造过程变更后、制造过程的运行被中断3个月或以上,供应商过程控制绩效的验证要形成文件。 Ensure that any quality issues that may arise are quickly identified, contained, and corrected at the suppliers location 确保任何可能出现的质量问题在供应商的现场被快速识别、遏制和纠正 Increase involvement and visibility of supplier’s top manag

文档评论(0)

153****9595 + 关注
实名认证
内容提供者

该用户很懒,什么也没介绍

1亿VIP精品文档

相关文档