LEED美国绿色建筑认证考试官方复习材料 EQ.doc

LEED美国绿色建筑认证考试官方复习材料 EQ.doc

  1. 1、本文档共6页,可阅读全部内容。
  2. 2、有哪些信誉好的足球投注网站(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
  3. 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  4. 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
LEED美国绿色建筑认证考试官方复习材料 EQ

Learning to LEED: Day 2 Indoor Environmental Quality Quiz 1. Number of Prerequisites in the Indoor Environmental Quality category: Number of Credits in the Indoor Environmental Quality category: Number of Points in the Indoor Environmental Quality category: 2. Within the Indoor Environmental Quality category, which of the following credits can only be submitted during the construction phase of the project? (Choose two.) EQc1, Outdoor Air Delivery Monitoring EQc2, Increased Ventilation EQc3, Construction IAQ Management Plan EQc4, Low-Emitting Materials EQc5, Indoor Chemical Pollutant Source Control EQc6, Controllability of Systems 3. Match the following statements with their respective points: EQc8.1, Daylighting Views, Daylight 75% of Spaces EQc8.2, Daylighting Views, Views for 90% of Spaces If the percentage of floor area in a private office experiencing [daylight or direct line of sight] is 75% or greater, the entire square footage of the room may count toward the requirement for the point Draw a horizontal line at 42” In ALL cases, only the square footage meeting the minimum requirements of the point may be counted toward its achievement Take measurements on a 10-foot grid for all occupied spaces 4. In order to achieve EQc3.1, Construction IAQ Management Plan, During Construction, permanently installed air handlers during the construction and pre-occupancy phases must have a filtration media of at least MERV . In order to achieve EQc5, Indoor Chemical Pollutant Source Control, air filtration media installed prior to occupancy must provide at least MERV . 5. Match the following requirements with their respective point: MRc3.1, Construction IAQ Management Plan, During Construction MRc3.2, Construction IAQ Management Plan, Before Occupancy Perform a building flush-out with 14,000 cu.ft. of outdoor air per sq.ft. of floor area Protect stored on-site or installed absorptive materials from moisture damage Meet or exceed the Control Measure of

文档评论(0)

pangzilva + 关注
实名认证
内容提供者

该用户很懒,什么也没介绍

1亿VIP精品文档

相关文档