- 1、本文档共9页,可阅读全部内容。
- 2、有哪些信誉好的足球投注网站(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
- 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
项目管理CH08(英文)
Chapter 8Resource Considerations Learning Objectives Learn how to take resource constraints into account Determine the planned resource utilization for a project Level the use of resources within the required time frame Determine the shortest project schedule with limited resources Real World Example Vignette: San Diego County moves toward e-government First year: replace 15-year old telephone system, old PCs, the data network, and several key software applications. Implement first ever countywide e-mail and voice mail systems. Second year: replace the outdated HR system and their old financial system. Develop data warehousing capabilities. Third year: provide an internet delivery channel for all county services, such as on-line permits and tax payments. A $644 million pact was approved, making this of of the most aggressive outsourced contracts by a U.S. local government. Real World Example Vignette: Advice from an Expert – Barbara Perrier-Dreyer After numerous successful projects and awards, Barbara offers the following suggestions: Spend plenty of time on up-front design and requirements Ask technical leads HOW they will build the product Make sure you can measure progress along the way Test. Test. Test. Give the team regular feedback Have some fun and say thank you – a lot! Resource-Constrained Planning Nearly all projects have limits on available resources. Project delays often occur due to certain resources being unavailable. A network diagram can be drawn to reflect the availability of a limited number of resources. Planned Resource Utilization It’s necessary to indicate the amounts and types of resources needed to perform each activity. Resource utilization based on each activity’s earliest start time are based on an as-soon-as-possible (ASAP) schedule. Resource utilization charts based on each activity’s latest start time are based on an as-late-as-possible (ALAP) schedule. Resource Leveling Resource leveling, or smoothing, is a method for developi
您可能关注的文档
最近下载
- 2024年高空作业考试题库附答案5套(完整版).DOC
- 印刷类原辅料进料检验标准.pdf
- 部编人教版四年级上册《道德与法治》全册教学反思.pdf VIP
- 江苏省南通市2023-2024学年高一上学期语文期中考试试卷(含答案).pdf VIP
- 国家开放大学《中国近现代史纲要》社会实践报告.docx VIP
- 领读经典-现代文学(1)(山东大学)中国大学MOOC慕课 章节测验期末考试答案.docx
- 《幼儿挑食、偏食行为的原因分析及对策》开题报告(含提纲)5800字.doc
- 2022年贵州省高职(专科)分类招生中职生文化综合考试试卷(语数英、含答案).pdf
- 小学语文优秀教学案例.docx VIP
- 冬季血压早达标远离心脑血管疾病-高血压慢性病培训讲座课件PPT.pptx
文档评论(0)