[其它考试]Autodesk Moldflow Insight BronzeA Certification
Autodesk Moldflow Insight Bronze Certification
Introduction
Section 1
Section 1 has questions that relate to the use of Synergy, using various Autodesk Moldflow Insight flow analyses and
results interpretation.
Ensure you have the answer sheet which is an excel file called BronzeA_Answers.xlsx.
Place your answers on the Sect1_Answers sheet.
For each question, choose the BEST answer.
Each question is worth 1 point for a total of 70 points.
No reference materials may be used during this portion of the exam.
Plan on section one taking 40-50 minutes to complete. You may have as much time as you like, but don’t take too
much time, you will need it to complete section 2.
Append your name to the beginning of the answer sheet file name, such as John_Doe_BronzeA_Answers.xlsx .
Section 2
Section 2 is a hands-on.
You are given 5 study files to compare the results.
You are given a study file and directions for creating a feed system.
You are given several MFR files to interpret molding window and Fill + Pack analysis results.
This section is worth 205 points in total.
For this section you can use the on-line help as a reference.
Grading
There are a total of 275 possible points in this exam. To pass this test, you must score an 80% or 220 points
minimum.
Return the necessary files to Autodesk for grading. Instructions for returning the files are on page 34.
The entire test should take between 5 to 6 hours to complete. The test is limited to 6 hours.
Autodesk Moldflow Certification Exam, Bronze A 1 of 34
Revised 7/6/10
Section 1
1. In general, the largest component of the cycle time is:
A. Fill time.
B. Pack time.
C. Cooling time.
D. Clamp open time.
2. Due to fountain flow, the highest velocity in the cross section is located at the:
A. Center of the cross section.
B. Plastic/metal interface also called the mold surface.
C. Half way between the