河北冀中能源邢台矿业集团辛泉矿井初步设计说明资料.doc

河北冀中能源邢台矿业集团辛泉矿井初步设计说明资料.doc

  1. 1、本文档共30页,可阅读全部内容。
  2. 2、有哪些信誉好的足球投注网站(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
  3. 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  4. 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
河北冀中能源邢台矿业集团辛泉矿井初步设计说明书 6.、矿井生产系统。包括提升、运输、通风、排水等系统的确定和设备选型及相关硐室的布置。 本次设计共用时12周,时间较为充足。由于个人水平有限,缺少现场生产经验,所以在设计中难免有不足之处,恳请各位老师给予批评指正,最后谢谢王老师半年的辛勤指导。 关键词:地质构造、开采水瓶、开拓方式、采煤方法、井底车场。 Abstract This graduation design is about the new mine planning for the first mineral of Xinquan coal mine. which is a coal mine belonging for Hebei Ji zhong neng yuan Han dan CMA Before the graduation, we design group, led by the teacher Wangtongjie deep into the mine for one month of graduation practice, during which we collected all the information needed to graduation, while the actual production line has accumulated experience in production and management .Through the practice so that we more deeply understand our future work, and learned an important design ideas and design experience in field work involved, for the graduation project has laid a good foundation for the future work and accumulated valuable experience. The graduation project is Wang under the guidance of teachers and students to complete, and is four years of university study mining engineering a comprehensive summary. Xingquan preliminary design of mine include the following components: 1., Mining of natural geography, hydrology, geology, transportation and other basic information outlined; 2., Ida mine coal reserves within the industrial reserves and recoverable reserves; 3., Mine production capacity and service life; 4., Ida mine the overall development design, shaft location and form of selection, the level of division, extending the program to determine, by mining areas, the determination and the shaft bottom line basis, chamber arrangement of content; 5., Mine mining area ofthe layout, face layout, production and transport machinery selection, production process arrangement, the design of mining and manufacturing district station mining face identification technology. 6., Mine production system. Including the promotion, transport, ve

文档评论(0)

xingyuxiaxiang + 关注
实名认证
内容提供者

该用户很懒,什么也没介绍

1亿VIP精品文档

相关文档