[交通运输]4×45m预应力混凝土简支T型梁桥.doc

[交通运输]4×45m预应力混凝土简支T型梁桥.doc

  1. 1、本文档共60页,可阅读全部内容。
  2. 2、有哪些信誉好的足球投注网站(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
  3. 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  4. 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
[交通运输]4×45m预应力混凝土简支T型梁桥

本 科 毕 业 题 目 4×45m预应力混凝土简支T型梁桥 学 院 城乡建设学院 专 业 土 木 工 程 学生姓名 李 长 春 学 号 200810211335 年级 2008级 指导教师 王 伟 职称 讲 师 2012 年 5 月 28 日 4×45mThe prestressed concrete simply-supported T bridge design Specialty: civil engineering Student Number: 200810211335 Student: Li Changchun Supervisor: Wang Wei Abstract:This design USES the fabricated the simply supported beam structure T, the upper structure by the beam, the main girder, driving DaoBan, bridge part and bearing of, is the main girder bridge bearing component. Its main the beam and driving through the DaoBan connection to become whole, make the vehicle load in the beams have good between transverse distribution. Bridge deck part includes bridge deck pavement, extendable devices and baluster etc. This design is mainly affected by the control of the bending moment across chung, span increases, the cross by constant load in live load and the bending moment caused will increase, is the strength of the material for the structure of gravity consumption, which limit the ability of the cross. This design USES the 44.95 m standard span, in the design of main girder internal force calculation, stress by steel girder layout, strength and stress checking and cross section driving DaoBan and bearing, pier and so on design, constructed a fabricated prestressed concrete simply-supported T shape beam bridge, the checking fully meet the requirements, the method and the corresponding standard. This design is a key to highlight in the application of prestressed bridge, this also reflected in our country the trend of the development of the bridge. Key words:prestressed;Jane a T beam;Zhang method after;Stress checking 目录 绪论 1 1 设计资料及构造布置 2 1.1 设计资料 2 1.1.1 桥面跨径及桥宽 2 1.1.2 设计荷载 2 1.1.3 材料工艺 2 1.1.4 设计依据 2 1.2 构造布置 3 2 主梁截面几何特性计算 4 2.1 截面几何特性 4 2.2 检验截面效率指标ρ 5 3 主梁内力计算 6 3.1 恒载内力计算 6 3.1.1

文档评论(0)

qiwqpu54 + 关注
实名认证
内容提供者

该用户很懒,什么也没介绍

1亿VIP精品文档

相关文档