电气专业英语对话.doc

  1. 1、本文档共3页,可阅读全部内容。
  2. 2、有哪些信誉好的足球投注网站(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
  3. 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  4. 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
电气专业英语对话

Z: Hello, May I help you? S: Yes, I’m from ABB Company. Z: Welcome to the Project Department. I’m Zhou Yi, deputy director of the Project Department. May I have your calling card? S: Yes, here you are. I’m Jack Smith, senior supervisor of Sales Division of ABB Company. Here’s our brochure. Z: ……Oh, I see. This project is to build a large fossil-fired power station, which has two 600MW units, The preparation for the project has been done for more than one year. S: I have heard about it. I would like to know what preparatory work has been done for the project up till today? Z: Er, the investment agreement on the project has been reached and the Project Department set up is to assume the construction work. East China Electric Power Designing Institute (ECEPDI) is committed to carry out the feasibility study on the project. S: So, how is the feasibility study going? I want to know more. Z: En, first of all, thanks to the lasting gap between power supply and demand in this area for a period of time in future, it’s necessary to build a new power station. It is to be located near the Changjiang River from where it is easier to get the main fuel and the circulating water for the turbines. Electrostatic precipitators and stack-gas desulfurization facility are to be equipped with to lessen the influence on environment. Feasibility study is a very important procedure of the project. Two weeks ago, we submitted the official document of the feasibility study to the government for its final approval. S: Is it necessary to get the government’s permission? Z: Sure, it’s a lawful procedure to the project of this kind. S: I see. Then what’s your next step? Z: We hope to get the government’s approval within three weeks, and then we will start the primary design of the project. Z:你好,我可以帮你吗? S:是的,我来自ABB公司。 Z:欢迎来到项目部门。我叫周易建联,副 项目部门的主任。请问你叫 卡吗? 是的,给你。我叫杰克·史密斯,高级主管,销售部门的ABB公司。这是我们的小册子。 Z:……噢,我明白了。这个项目是建立一个大型火电站发电站,它有两个600 mw机组,准备项目已经做了一年多了。 S:我听说过它。我想知道什么准备工作已经做完的项目到今天? Z:呃,这个项目投资协议已经达成,

文档评论(0)

xy88118 + 关注
实名认证
内容提供者

该用户很懒,什么也没介绍

1亿VIP精品文档

相关文档