- 1、本文档共31页,可阅读全部内容。
- 2、有哪些信誉好的足球投注网站(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
- 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
Systems Engineering and Project Management - :系统工程与项目管理—
Additional Questions? Suggestions? Comments? Thank You Very Much for Your Time!!! * The 25th Int’l Forum on COCOMO Systems/Software Cost Modeling The 25th Int’l Forum on COCOMO Systems/Software Cost Modeling Systems Engineering and Project Management: Similarities and Differences for Cost Estimation Dr. Ricardo Valerdi – Massachusetts Institute of Technology Leone Young – Stevens Institute of Technology COSYSMO Workshop The University of Southern California (USC) November 4th, 2010 The 25th Int’l Forum on COCOMO Systems/Software Cost Modeling * Workshop Agenda Introductions Objectives Research Background Project Management Cost Models and Feedback Survey Inputs Discussion * 1:30 – 1:35 pm 1:35 – 1:50 pm 1:50 – 2:05 pm 2:05 – 2:35 pm 2:35 – 2:50 pm Objectives Discuss the similarities and differences between systems engineering and project management Obtain feedback on a proposed project management cost estimating model Conduct survey to determine the expected level of project management efficiency multipliers Obtain inputs on the appropriateness and adequacy of the proposed project management cost model, its cost factors and drivers Provide an opportunity for participants to contribute their expertise and perspective regarding project management services and influence the direction of future research * * Research Background: Systems Engineering (SE) Project Management (PM) Cost Management – Project Air Force by Rand Development Management = Systems Engineering (SE) Project Management (PM) Defense Industry – US Air Force Programs (Stem et al., 2006) Development Management (100/%) = SE (50%) + PM (50%) SE/PM costs doubled since 1960s SE/PM as a function of Integrated Logistics Support (ILS) for a typical Air Force program (Stem, et al., 2006) Aircraft SE/PM Costs as a Percentage of Total Development Cost for All Development Programs, 1960s–1990s (Stem, et al., 2006) * Research Background: Systems Engineering (SE) Project M
您可能关注的文档
- RECIST-实体瘤疗效评价标准.ppt
- REPORT OF MEDICAL EXAMINATION:医学检查报告.doc
- Reliability Block Diagram Modeling – A Comparison of the Results :可靠性框图建模–结果的比较.ppt
- Review of the Local Analysis and Prediction System Project:的局部分析和预报系统项目的审查.ppt
- qc成果铁路防切板.ppt
- Risk Management Selected Concepts - International :风险管理选择的概念-国际.ppt
- RNA extraction protocol for total RNA - TAU:总RNA提取的RNA头协议.doc
- RFID、产品电子编码、MEMS技术.ppt
- rocscience_Examine 3D 三维地下开挖边界元分析教程.ppt
- rocscience_Slide 边坡稳定性分析软件教程.ppt
文档评论(0)